Home
|
Survey
|
Payment
|
Talks & Presentations
|
Job Opportunities
Journals
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
Railway Construction Technology
1009-4539
2014 Issue 3
Construction Technology of Ultra Shallow Water Rich Fully Weathered Granite and Large Section Tunnel
Cui Hongqin;
..............
page:1-4,12
Deep Well Dewatering Technology of Ganqing Tunnel
Wen Hui;
..............
page:5-8
Research on the Work Efficiency of the Three-bench Seven-step Excavation Method in Tunnel
Liu Jianjia;
..............
page:9-12
Construction Technology to the Treatment of Subsidence Sink Invasion of Aeolian Sandy Loess Tunnel with Walking Type Pipe Shed
Zhao Xiangping;
..............
page:13-16,20
Construction Technique of Controlled Blasting Combined with Different Blast Holes in Horizontally Bedded Sandstone and Mudstone
Chang Wei;
..............
page:17-20
Study on the Testing Technology of Long Distance Horizontal Rotary Jet Grouting Pile
Wang Baoqing;
..............
page:21-25
Application of Accurate Analysis on the Groove Wall Reinforcement Area of Underground Continuous Wall with Finite Element Simulation
Huang Yafei;
..............
page:26-31
Design and Construction for the Deep Water Pier Foundation Nanjing-Anqing Railway Steel Sheet Pile Cofferdam
Ma Jie;
..............
page:32-35
Cause Analyses and Treatments for the Common Problems During Steel Strand Prestressing
Li Yong;,Pei Shulin;
..............
page:36-39
Mix Technology of Grouting Grouts for Karst Roadbed
Wang Houlin;
..............
page:40-42
Construction Techniques for Low Vibration Ballastless Track of Heavy Haul Railway
Gao Xingjiang;
..............
page:43-47
The CRTSⅡ Type Double Block Type Ballastless Track Construction and Disease Treatment Technology
Li Zhijie;
..............
page:48-52,56
CRTS Ⅰ Ballastless Track Slab Fine Adjustment Technology
Peng Dong;
..............
page:53-56
Truss and Grid Installation Technology of the Undulating Roof of Ji'nan West Station in JingHu High-Speed Railway
Li Jianguo;
..............
page:57-59,79
Uninterrupted Power Supply Transformation Technology for the Existing Traction Substation
Guo Zhongkuan;
..............
page:60-62
The Efficient Rotary Drilling Technology for Chemical Mud Wall Under Complicated Geological Conditions
Gao Yingjie;
..............
page:63-66
Design and Construction of 0# Steel Pipe Support on Songhuajiang River Bridge for Passenger Dedicated Railway from Harbin to Qiqihaer
Wang Xinfeng;
..............
page:67-70,74
Design and Construction Technology for Cast-in-situ Box Girder Bracket of Small Radius and Large Longitudinal Slope
Bai Zibin;
..............
page:71-74
High Pier Double Track to Four Track Switch Continuous Beam Construction Technology
Wang Canjun;
..............
page:75-79
Application of Steel Fiber Reinforced Concrete in Bridge Construction in Cold North
Han Jianchao;
..............
page:80-82
Analysis and Discussion on Stretch Control of Post-tension Short Beam Pres-stress Steel Strands
Yang Zhu;
..............
page:83-85
Improvement Techniques for Residue Soil of Shield Tunneling in Water-rich Sand Bed
Ning Shiliang;
..............
page:86-90
Replacement of Fork Section Lining of Incline Shaft of Soft Rock Tunnel Under High Stress
Ye Yu;
..............
page:91-94
Ripping Construction Technology for the Entrance of V-Class Water-rich Rock Two-lane Inclined Shaft into Tunnel
Deng Qihua;,Wang Youjun;,Yao Rigao;
..............
page:95-98
The Super-long Concrete Seamless Construction Technology of Subway Station
Li Tan;,Xing Xiangyang;
..............
page:99-101
Construction Technique of Reclamation Hydraulic Silt Fill Foundation Treated by Vacuum Combining with Surcharge Preloading Method
Xu Gaoshan;
..............
page:102-106
Rock Salt Subgrade Filling Construction Technology of Luozhong Railway
Pang Qianfeng;
..............
page:107-109,121
Bare Concrete Sheet Pile Wall Construction Technology on Ancient Landslide Mass
Liu Xiaoyong;,Wang Guifen;
..............
page:110-113
Construction Technology of the Riverbank Road with Slab-pile Wall as Retaining Structure across Flood Season
Wang Guifen;
..............
page:114-117
Optimized Algorithm on the Pile Length and the Deflection Distance of the High Speed Railway at Any Point
Feng Kaili;,Zhang Panhua;
..............
page:118-121