Railway Construction Technology
1009-4539
2014 Issue 1
Parametric Analysis on Shear Lag Effects of Box-Girder Beam
Han Chenglin;
..............
page:1-3
Design of Fully Welded Large Span Continuous Steel Truss Bridge over Railway
Liu Guihong;
..............
page:4-6
Structural Design of 48m Simply Supported U-shaped Beam in Single-track Railway
Li Fangke;
..............
page:7-10
Brief Analysis on the Design of the H-Loop Bridge
Jing Yaling;
..............
page:11-12,16
Pile Foundation Design of Deep Miscellaneous Backfilling Railway Bridge
Pang Yuanzhi;
..............
page:13-16
Treatment of "lowering-head" in the Jacking Construction of Framed Structure Bridge
Yan Chun;
..............
page:17-18,22
Technological Design for the Pre-tensioned Prestressed Concrete U-beam Fabricating Yard
Zhang Liqing;
..............
page:19-22
Analysis of Disease Causes of High-speed Railway Subgrade
Qiu Jinting;
..............
page:23-26
Overall Design and Thought of High-speed Rail Program in Extremely Cold Regions
Liu Song;
..............
page:27-30,43
Study on Design Problems of CWR Track on Long Span Bridge
Gong Xiaoping;
..............
page:31-34,53
The Main Geotechnical Problems in the No.2 Line of Taiyuan Metro Construction
Jiao Qingjie;
..............
page:35-37,40
Discussion on the Signal System of Station Layout in the Tunnel
Ning Yongmei;
..............
page:38-40
Discussion on the Construction & Management of China Overseas Engineering
Li Yang;
..............
page:41-43
Study on the Planning of Metro Project
Wang Zhinian;
..............
page:44-48
Study on the Embarking Capacity of Railway Cargo Line Using Quick Ration Loading System
Chen Hongjun;
..............
page:49-53
Study on Mechanical Behavior of Box Girder with Corrugated Steel Webs of Cable Stayed Bridge
Guo Qingchun;
..............
page:54-57,62
Track Thrusting Technology for Overpassing Railway Steel Box Girder Construction
Yan Yongfeng;
..............
page:58-62
Discussion on Cantilever to Cast-in-situ scheme of Continuous Beam of a Bridge (60 + 100 + 60)m on Harbin-Tsitsihar Passenger Dedicated Line for
Guo Yanwei;
..............
page:63-66
Optimization and Implementation of Variable Cross-section Continuous Box Girder of Zhengzhou-Kaifeng Intercity Railway
Zhang Yongsheng;
..............
page:67-71
Application of PTFE Slide in Full Scaffold Construction
Wei Xiaoxia;
..............
page:72-74,78
Construction Technology on Pumping Concrete into Steel Tube of Encased Arch Bridge
Li Shengrong;
..............
page:75-78
Key Technology of Frost Heaving Prevention for Subgrade Construction of Harbin-Tsitsihar Passenger Dedicated Line
Wang Ximing;
..............
page:79-82,111
Test on the Wet Screening Method for Subgrade Fillings of Strong Weathered Soft Rock
Wang Hechun;
..............
page:83-85
Analysis on the Construction Process of the Highway Tunnel and the Evaluation of the Supporting Parameters
Cai Chao;
..............
page:86-89,93
Dewatering Construction Technology of Jinci Tunnel and Settlement Analysis
Yan Yongfeng;
..............
page:90-93
Simple Analysis on the Safety Problem of the Subway Shield Tunnel Construction
Le Jun;
..............
page:94-96
Construction Technology of Recoverable Anchor Cable in Deep Foundation Pit
Wang Dongxin;
..............
page:97-99
Corrosion Protection Technology for Concrete Silane Impregnating Surface Treatment in Cold Regions
Li Anjie;
..............
page:100-102
Repairing and Strengthening Technique for the Cracked Cutterhead on Shield Machine in the Tunnel
Hu Junnan;
..............
page:103-107
Demolition of Brick-structured Chimney by Blasting in Complicated Environment
Wang Zhongli;
..............
page:108-111