Influence of change of underground water level on stability of sideslope
Liu Cuirong
..............
page:79-81
Secondary risk of displacement pile construction and its remedy measures
Li Jianfeng;Han Zhiguo;Yao Xingyou
..............
page:82-84
Study of criteria on subsidence control in short section of subgrade between two bridges(tunnels)
Cai Chengbiao;Wei Yongxing
..............
page:85-87
Static loading test of in-situ piles with end embeded into rock
huang zhi quan ; ma sha ; wang an ming ; liu tian jun
..............
page:88-90
Exploration on construction technique of huge machine set of track maintenance on Qinhuangdao-Shenyang passenger dedicated railway
Wu Yanjiang
..............
page:90-92
Exploration on construction technology of ballast replacing using huge machine of track maintenance
Fang Dacheng;Zhao Guangwen
..............
page:93-95
Study of cement asphalt motar included in elastic pad under slab track
Zuo Jingqi;Jiang Qibin;Fu Daizheng
..............
page:96-98
Method and related tools in calibration of mechanism's "zero point" used for non-standard track
Wang Jiaming
..............
page:99-101
Research on steel-fibre concrete used in seismic structure of highrise building
Wei Aifeng
..............
page:102-103
xin xi chuang
..............
page:65,74,87
Application of deep mixed piles in treatment of soft subsoil
Wang Guan
..............
page:77-79
Summary of construction methods concerning treatment of subgrade mud-pumping
Wang Tingdong;Liu Zhenyuan
..............
page:75-76
Numerical similation analysis on sideslope stability of two banks of a river
Dong Zhiming;Liu Hongxing
..............
page:72-74
Application of hot-rod technique in subgrade on permafrost region of Qinghai-Tibet railway
Yan Chaoyang
..............
page:70-71
Mechanism of reinforcing subgrade in condition featuring shallow buried and lie-hidden karst by using clay consolidating grouting
ni hong ge ; guo lan ying ; liu zhi ru ; mu chun ge
..............
page:68-69
Construction technique of platform and foundation in deep waters and steep incline rock
Zhang Wenhui
..............
page:66-67
Design of repair, maintenance and management mode for TBM(Tunnel Boring Machine)
Wang Xiaoxia
..............
page:63-65
Control of cracks in concrete lining of large-span cavern
He Peijun
..............
page:60-62
Finite difference method analysis of excavation and supporting in tunnel
zhu zan cheng ; hua yuan ; fu xiao ying ; jia xu ; song wei dong
..............
page:57-59
Application of assembling concrete lining jumbo in Shenzhen water supply tunnel project
Qiu Faqi
..............
page:55-56
Exploration on construction in tunnel entrance section featuring partial load, shallow cover and fragmentation
Fang Yuan
..............
page:53-55
Construction technique of curtain grouting and deep-hole grouting from ground surface used for Tianxinshan tunnel
Chen Jincheng
..............
page:50-52
Metro station featuring two storeys and island platforms used for interchange between upper and lower platforms
Hu Kaishan;Qiu Hongmei;Liang Weicong
..............
page:47-49
Research of construction machines and tools as well as construction technology in replacing wide sleeper with Ⅲ-type sleeper
Liu Mingliang
..............
page:45-46
Application of Finite Element numerical similation for predicting ground surface's settlement occurred in driving large-cross-section metro tunnel
Cao Junfa
..............
page:42-44
Design of bridge and culvert on arterial road of Guangzhou New International Airport Road
He Yinglei
..............
page:38-41
Risk in flood season for bridge with shallow foundation and its protective measures
Yu Jingkui
..............
page:36-37
Similation analysis on construction process of large-span bridge
Sun Ligong
..............
page:34-36
Assembling huge bridge-erecting mechanism using existing equipments
Lin Gang
..............
page:31-33
Method of eliminating eccentric of curved steel girder bridge
Li Xiaoguang
..............
page:29-31
Influence of bridge-track interaction on railway bridge design
Deng Xuesong
..............
page:25-28
Elementary exploration on shrinkage and creep effect and crack mode of concrete in bridge structure during transferring from simply supported to continuous system
Chen Qiang;Hong Xiangdong
..............
page:1-3
Construction and quality control technique of reinforcing soft subsoil in back of bridge abutment by deep cement mixed piles
Liu Xiangdong;Zhan Huihong
..............
page:4-5
Analysis of stress supervision monitoring during construction of large-span continuous rigid frame bridge
Wu Fangwen;Fang Hui;Zhao Lei
..............
page:6-8
Design and inspecting calculation of construction scaffolding for casting of box girder in-place
Qi Yanxiang
..............
page:9-11
Thinking on design of cofferdam construction by using hulky steel sheet piles
Qiu Xunbing
..............
page:12-14
Analysis of causes inducing inclination of flare wingwall for railway frame-shaped structure and its treatment
Pan Chengjie
..............
page:15-16
Key technique in construction of cable-stayed bridge with low pylon
Sun Jianping
..............
page:17-18
Design and construction of scaffolding used in casting of main arch rib of arch bridge in-place
Tian Baiyu
..............
page:19-21
Solution to problems in construction of cast-in-place piles used as bridge foundation
Chen Kala
..............
page:22-23
Design of jacking of frame-shaped structure and its rectifying deviation
Sun Yamin;Liu Guochun;Jin Liancai
..............