Home
|
Survey
|
Payment
|
Talks & Presentations
|
Job Opportunities
Journals
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
Railway Engineering
1003-1995
2005 Issue 5
Suggestion on selection of curve length in planning of track overhauling
Zhao Hongzhou
..............
page:81-83
Reconstruction of turnout area to getting continuous welding turnout for speed-increasing railway
Zou Guocheng
..............
page:83-84
Elementary discussion on government's ensuring obligation in Building-Operation-Transfer(BOT) fundraising adopted in railway construction
Liu Xinshe
..............
page:84-86
Corrective coefficient method of calculated length in model of fastening-type steel-tube scaffolding frame
Liu Jianmin;Li Huimin
..............
page:87-89
Comparison between several varieties of vertical current distribution main in high rises design
Liao Chuanxin
..............
page:90-92
Influence of hardening accelerator on concrete's strength and modulus of elasticity
Wu Zhihuan
..............
page:93-94
Elementary discussion on control over quality of consisting materials of concrete and structural durability
YANG Xiangmin;Li Bingtai
..............
page:95-96
Quality control over high-performance concrete in production
zuo rong jun ;ju rongjun
..............
page:97-98
Test on optimal selection of grass seed used for ecological sideslope protection in area of Hunan province on Luoyang-Zhanjiang railway line
ni hong ge ; shi yun ; chao wan li ; wang xing hua ; zhu jian de
..............
page:99-100
hun ning tu qiao de xing neng he dui xing she ji
meng qing ling
..............
page:69,86
Control over key procedure of curve lifting and lining on existing railway
Duo Shengqi
..............
page:78-81
Design of transmission drive for axel gearbox in huge maintenance of railway machine and analysis of breakdown
Yang Bin
..............
page:75-77
Exploration on maintenance method of curve section on heavy hual railway
XU Yuquan
..............
page:73-74
Control over quality in production of rail's adhensive frozen joints
Liu Benquan
..............
page:72
Control over quality of thermit welding for rail connection
Li Dongxia
..............
page:70-71
Elementary discussion on relation between sideslope stability and ecological protection
Cui Yuqiang
..............
page:68-69
Construction technique of embankment with Expansive Polystyrene-based light filling material
Zhang Lin;Zhan Qifang
..............
page:66-68
Confined plate vibratory roller and analysis of soil compacting effect
Liu Yi;Liu Shangju
..............
page:63-65
Analysis of sugrade's sideslope defects and design principles of its protection
Wu Yuqing
..............
page:61-63
Estimate of final settlement of Shengang passenger inspection building
Li Qi
..............
page:58-60
Determination of subsoil's ultimate bearing capacity by indefinite mathematical method
Song Yanhui
..............
page:55-57
Application of prestressed anchor-cable frame in reinforcing high and steep sideslope near cut
Li Zhongguo;Zhang Yufang
..............
page:53-55
Experimental study on property of bearing capacity in gangue subsoil
bie xiao yong ; zhou guo qing ; zhao guang si ; liang heng chang
..............
page:50-52
Treatment of exploited empty area under Zhengzhou-Shaolinsi expressway by grout-filling method
Liu Wenjuan;Tian Junliang;Zhang Xiaoqiang
..............
page:47-49
Coplaning survy through shaft in construction of metro tunnel and its alignment accuracy analysis
Wang Tiesheng;Zhai Jihong
..............
page:44-47
Discussion on pre-reinforing effect in front of working face through pre-grouting with micropipe in Sanduanling No.1 tunnel on Meihe expressway
Cheng Xinjun;Cheng Wei
..............
page:42-44
Numerical analysis about influence of tunnel construction on potential landslide body and its treatment
Yan Qixiang;He Chuan
..............
page:38-41
Application of flexible contracting I-beam steel frame in soft and expansive surrounding rock of railway tunnel
Jiang Xigui
..............
page:36-37
Technique of control over construction quality of covered ditch in saturated clay
Lin Fusheng
..............
page:33-35
Application of foregrouting formed into deep-hole curtain to driving bored tunnel with shallow cover
Li Xudong
..............
page:30-32
Static loading test on T-shaped double directional prestressed 16 m-span concrete girders
Huang Xuquan
..............
page:26-29
Analysis of brakingforce transferring in simply-supported concrete girder bridge
Gao Wei;ZHANG Yunbo
..............
page:1-3
Study on static loading test for Qingzuo Lake's bridge
QIU Bin
..............
page:4-6
Design of construction scaffolding used in railway tied arch bridge casted in place
Jing Gaiping
..............
page:7-9
Construction method on jacking of circular culvert and its quality control
Chen Weidong
..............
page:10-12
Calculation of curve length for bridge backwater
Zhang Baizhan;Huang Meilan;Meng Juntao
..............
page:12-14
Closure of intermediate span in large-span constinuous rigid frame bridge under high temperature
Liu Haibo
..............
page:15-17
Design and construction of curved continuous box-girder by casting in place with scaffolding
Shao Fengshu
..............
page:17-18
Construction of cast-in-place piles through strutum with karst caverns
Yao Junjun;Yao Hui
..............
page:19-21
Construction technique of cast-in-place piles-foundation in extra-long bridge over Shuangtaizi river
Tang Zhenfeng
..............
page:22-23
Construction technique of track reinforing during jacking of frame-shaped structure under existing railway
WANG Duo
..............
page:24-26