Railway Engineering
1003-1995
2005 Issue 2
Rebuilding technique of rainproof awning and catenary in operating railway station
Chen Wenbo
..............
page:78-80
Application of construction technique of soil-nailing wall to supporting in deep foundation pit
Wu Yushan
..............
page:81-83
Soil rheology and its making use in composite subsoil with cement-mixed piles
Qin Yanhua;Zhang Fan;Wang Jun
..............
page:84-87
Consolidation technique used in building subsoil adjacent to deep foundation pit
Zhao Fengzhen
..............
page:87-88
Discussion on plan of intercity fast railway network in region around Bohai Bay including Beijing,Tianjin metropolis and Hebei province
Kang Xuedong;Wang Changzhao
..............
page:89-91
Discussion on some issues in safety supervision
Gao Guishan
..............
page:91-92
Attention should be paid to some problems in construction of expressway in mountain area
He Yong;Chen Kongjin
..............
page:93-95
Supervision over construction cost of engineering project
Wan Xin
..............
page:96-97
The introduction to a new type of ZU4 election-hydraulic cell
HONG Min
..............
page:98-98
Application of high-pressure grouting and compaction grouting to rectify deviation and strengthen subsoil of building
Xu Haoran
..............
page:75-77
Strengthening measures to eliminate welding defects in steel tubular truss
Fan Xiaohui
..............
page:72-74
Study of fissures occurred on surface of concrete thin slab by in situ casting
Luo Yingjie
..............
page:69-72
Analysis of fissures occurred in reinforced concrete slab of rainproof awning of railway station platform and its treatment
Fu Shenghua
..............
page:67-68
Design of building containing railway communication and signal equipments
Huang Meinan
..............
page:65-66
Making up and placing of pumping concrete with two additives
Wang Bo
..............
page:62-64
The quality index of new railway subgrade and its inspection method
Shao Piyan
..............
page:59-61
Blasting technique of cut excavation in region of fractured rock and rich groundwater
Yao Hui
..............
page:55-58
Discussion on factors affecting safety coefficients regarding side-slope stability
Zhang Weimin;Chen Lanyun;Ling Daosheng
..............
page:52-54
Causes for subgrade bed defects of newly constructed railway in loess area and its treatment
Xu Weizhen
..............
page:50-51
Treatment for empty space area formed by exploitation of crystalline mine located in DK30 section of Jiaozhou-Xinyi railway
Wang Hengyue
..............
page:48-50
Study of management system in dynamic detection of track infrastructure
Zhao Gang
..............
page:45-47
Key points on quaility control of track laying and bridge erecting on Qinghai-Tibet railway
Li Zhonglong;Gao Zhenyu
..............
page:43-44
Technology characteristics of improved speed-increasing 1/12(VZ200) turnout to match 60 kg/m rail
Liu Jianjie
..............
page:41-42
Growing mechanism and control of grey spots resulted from rail contact welding
Zhang Jianxin
..............
page:39-40
Study on comprehensive construction technique of ballastless slab track
Xu Zhenlong;Wang Zhiyong
..............
page:35-38
Effective method of improving fatigue strength of rail bolts
MIAO Dehua;Xue Qiang;Wang Ping
..............
page:33-35
Control of rail locking temperature during maintenance of CWR in section
Liang Zhiwen
..............
page:30-32
Elementary research on track buckling prevention of ultra-long CWR
Li Kening
..............
page:28-29
Study on type selection of track structure used in passenger dedicated railway line
Yan Hongliang
..............
page:26-28
Technique of new and old structure intersection of Lengjiapo No.2 tunnel
Meng Fanjun
..............
page:24-25
Non-linear analysis of supporting structure in railway hard-rock tunnel
zhou tai quan ; hua yuan ; shen dong ; zhu zan cheng ; lian jun ying
..............
page:21-23
Scheme of scale-expanded reconstruction of Huoyan highway bridge over Changchun-Dalian railway
Shao Guoqiang;Ge Xiaohong
..............
page:1-2
Key points on optimal design and construction of hollow slab bridge over Zhuanglang river
Gao Fenrong;Liang Jianchang;Lu Tiejun
..............
page:3-4
Discussion on bridge safety under influnce of sand-exploitation pit in seasonally changing river course
Li Fujun;Zhang Baizhan;Wang Jundong
..............
page:5-7
Measures on repair and maintenance of bridge during operation
Xie Zhenqian;Xu Jun;Zhou Jia
..............
page:7-8
Application of georadar to forecast geological condition ahead of work face in tunnel
wang zheng cheng ; tan ju gang ; kong xiang chun ; wang gui rong ; ji yong peng
..............
page:9-11
Jacking of three-span frame-shaped structure obliquely across railway line
Tang Qingming
..............
page:11-12
Analysis on cause of fissures occurred in bridge's abutments and piers during construction and its treatment
Ji Xianghui;Wang Xunwen
..............
page:13-14
Application of computer-aided measurement to cross-section measure of railway tunnel
feng jie ; wang guo hui ; yang wang xing ; shan wei
..............
page:15-17
Making up and adopting of pumping concrete in secondary lining of Nanshan tunnel
Li Zhanguo
..............
page:18-20