Home
|
Survey
|
Payment
|
Talks & Presentations
|
Job Opportunities
Journals
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
Journal of Railway Engineering Society
1006-2106
2008 Issue 10
tie dao gong cheng xue bao tou gao xu zhi
..............
page:后插1
The Management Application of ISO9001 Quality Management System in Engineering Supervision
YANG Hong;ZHOU Zhao-jia
..............
page:100-103
Discussion on the United-Supervision Mode Applied in the Large Bidding Section of Railway Construction
WANG Yuan-peng
..............
page:96-99
Application Practice of Fixed Jack in Metro Depot
MIU Dong
..............
page:92-95
Design of Glass Curtain Wall of New Railway Station and Its Development Trend
LUO Han-bin
..............
page:87-91
Discussion on the Design of High Speed Railway Station and Yard
ZHANG Pei-yan
..............
page:83-86
Research on the Train Control Technology Based on GSM-R and GPS
ZHANG Shou-li
..............
page:53-57
Discussion and Fitting on GSM-R System's Wireless Transmission Model
WU Xi-qiao;HU Hua
..............
page:50-52,62
Analysis and Study of Traction Substation Phase Alternating Connection for Passenger Dedicated Line (PDL)
YIN Chuan-gui
..............
page:45-49
Quantitative Evaluation Research on the 10 kV Power System for High-speed Railway
SUN Jian-ming;YAN Qiu-rong
..............
page:40-44
Preliminarily Exploration on the Function Mechanism of Prevention and Treatment of Rockbrust for Tunnel
XU Xiang-dong
..............
page:36-39,44
Construction Technology of Large Cross-section Loess Tunnels with Shallow Cover and Unbalanced Load of Passenger Dedicated Line(PDL)
GAO Shu-feng
..............
page:32-35
Research on the Scheme for Construction of Large Span Three-arch Tunnel Underpass Building
WANG Tian-ming
..............
page:28-31
Design of Horizontal Rotary Erection Construction Technique for Dayandong Major Bridge
LI Ze-rong
..............
page:24-27
Application of Simplified Model of the Pile Foundation in Earthquake-resistance of Bridge
GONG Wei;QI Dong-yan
..............
page:20-23
Seismic Analysis of a Continuous Rigid Bridge
ZHU Xiao-hua
..............
page:15-19
Discussion on the Reformation Utilization Scheme of Existing Railway in Sanya District
YANG Yun-zhong
..............
page:11-14
Research on the Scheme of Geological Route Selection in Stream Valley Zone
HAN Kang
..............
page:6-10
Research on the Railroad Plan for Tangshan Area
QIN Bao-lai
..............
page:1-5,19
Discussion of the Structure Innovation for Upgrading of Integrated Station Building Design
GU Qiong-ying
..............
page:78-82
Adaptability Analysis of Scale and Capacity of the Entrance & Exit Depot Line of Beijing Multiple Unit Depot
GENG Jing-chun;NIU Hui-xiang;XIAO Chun-guang;XIE Min;SONG Jian-peng;XIE Tian-hua
..............
page:74-77
Research and Development on the Air Environment Simulation Software for Subway Stations
LIU Ying-jie
..............
page:70-73
Application Research on the OPC Technology in the Fields of Intelligent Building
CHENG Ming-Sheng
..............
page:67-69,95
Design and Actualization of Centralized Monitoring System for Security Inspection for Goods in Marshalling Yard
ZHANG Yan;XIAO Kun
..............
page:63-66
Research on the Scheme of Video Supervision and Control System for Large Marshalling Yard
JIAN Xia
..............
page:58-62