Home
|
Survey
|
Payment
|
Talks & Presentations
|
Job Opportunities
Journals
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
Railway Standard Design
1004-2954
2013 Issue 9
Research on the Fitting of Logistic Model and Verhulst Model for Subgrade Settlement Prediction
HU Xiao-yang;WANG Lian-jun;ZHANG Guang-zong
..............
page:1-4
Research on the Characteristics of Two-dimensional Wind Velocity Field of Embankment of Gobi Section of Linhe-Ceke Railway
YAO Li-qiang;ZUO He-jun;LI Gang-tie;LIU Bao-he
..............
page:4-9
Influence on CRTS-Ⅱ Slab Track Structure Caused by the Debonding between Slab and CA Mortar under the Action of Temperature Load
XU Hao;LIU Xiao;XU Jin-hui;WANG Ping
..............
page:9-12
Difference Analysis and Mechanical Calculation of Test Standards between China and England for Static Load Test of Bridge Pile Foundation in the Nigeria
YANG Chen-xi
..............
page:13-18
Research on Construction Technology for Laying No.42Large-scale Turnout at Xiamen-Shenzhen Railway
FANG Xiang-ming;GUO Yong
..............
page:18-21
Laboratory Model Experiment Research of Using Oblique Soil-Cement Mixed Pile for Subgrade Strengthening
WANG Zhu;SONG Xu-guo
..............
page:22-26
Design Strategy of a Railway Cutting with Soft Soil Stratum on a Slope
LIU Fu-sheng
..............
page:26-28
Influence of Cushion Layer's Thickness on Composite Foundation of Beijing-Shanghai High-speed Railway and Optimization Analysis
NIU Hui-min
..............
page:29-33
Influence of Slope Gradient on Gapless Turnout upon Bridge with Long Heavy Grade
YAN Le;XIONG Zhen-wei;WEI Xian-kui;WANG Ping
..............
page:33-36
The Influence Caused by Different Metro Yard and Depot Arrangements on Its Size Distribution and Operation Cost
CHEN Fu-gui
..............
page:37-39
Study of Intercity Rail Transit Architecture Based on Analytic Hierarchy Process
KANG Xue-dong;CHEN Yan
..............
page:40-43,53
Application Study of U-shaped Structure in Railway Embankment
WU Jian-feng;LI Ji-hong
..............
page:44-46
Research on Key Grinding Technology of CRTS-Ⅱ Ballastless Track Slab
Qin Xiao-guang;Hu Yuan
..............
page:47-50
Design for Rapid Construction of Large Segments of a Multi-span Continuous Girder
SU Guo-ming
..............
page:50-53
Analysis on Types and Characteristics of Bridge Structures of Wuhan-Guangzhou Railway Passenger Dedicated Line
LIU Zhong-ping;ZENG Min
..............
page:54-58
Application of Movable Protective Hanger Frame in Mid-span Closuring of a Bridge Erected by Horizontal Swing Method
GOU Bin
..............
page:58-61,89
Design for Strengthening Treatment of Bursting Cracks at Bottom Slab of Continuous Prestressed Concrete Girder of Railway Passenger Dedicated Line
CHEN Jv
..............
page:62-64
Analysis on Random Vibration Response of Metro Station Structure
MA Qian-ying;LIU Zhi-qin;WANG She-liang;XIONG Er-gang
..............
page:65-69
Discussion on Engineering Geological Features of High Stress Soft Rock during Construction of Railway Tunnel
WANG Jian-peng
..............
page:69-74
Launching Technology of Two Large-diameter Slurry Shield Machines in the Same Working Shaft on a 12‰ Downhill Tunnel
TANG Wei-ping;ZHAO Lin;ZHENG Yong
..............
page:75-81
Numerical Simulation Study on Fire Smoke Controlling in Railway Shield Tunnel
ZI Yi
..............
page:82-86
Comprehensive Treatment Technology against Water Seepage of Foundation Pit of Baiziwan Station on Beijing Metro
BAI Jun;MA Xiao-hua
..............
page:86-89
Research on Calculation Method of Wind Speeds of Overhead Contact Line System under the Influence of Wind-break Structure in Wind Region
LIU Gai-hong
..............
page:90-93
Research on Design Scheme of Overhead Contact Line System of All-parallel Direct Feeding System with Line Feeder for Chongqing-Lichuan Railway
WAN Lian-lu;GUAN Jin-fa
..............
page:93-95
Research on Integrated Automation System Configuration of AT Station of High-speed Railway Passenger-dedicated Line Based on IEC61850
LIU Geng-ran;LUO Ying-hong
..............
page:96-99
Influence of Traction Load of Heavy Haul Railway on Power Factor of Substation
WEI Chou-yuan;CAO Xiao-bin
..............
page:100-103
Development and Design of Human-Machine Interface in Integrated Supervisory Control System Based on GE Proficy/HMI SCADA-iFIX
MENG Qing-bo;ZHANG Hui-min
..............
page:104-107,110
Influence of Signaling Equipment Arrangement on Station Yard Length of Dead-end Type Station on Intercity Railway
ZHANG Guang-jun
..............
page:108-110
Study on Integrated Computer-aided Design System of Railway Signaling
JIA Li-sheng
..............
page:111-113,117
Application of Noise Reducer Installed at the Top in Sound Barrier Engineering of Urban Railway
HAN Ya-li
..............
page:114-117
System Design Integration of High-power Locomotive Maintenance Base
XING Tian-xiang
..............
page:118-121
Application Study on Modularity Technology of Engineering Construction of High-speed Railway
TANG Yuan-ning;CAI Jun-jun;ZHOU Fang-ting
..............
page:121-124