Railway Standard Design
1004-2954
2012 Issue 8
Research on the Design of Pier's Foundation of Bridge above Sandy River
QIU Bai-chu
..............
page:56-59,66
Construction Technology of 80 m Steel-Concrete Composite Truss Girder by Falsework Method
ZHANG Jian-ke
..............
page:71-75
Seismic Design of Long-Span Single-Track Continuous Concrete Girder Bridge in Railway at High Seismic Intensity Area
ZHANG Bei-wen
..............
page:40-45
Research and Application on Automatic Leveling System of the Arm of DJ Series Bridge Launcher
WANG Zeng-liang
..............
page:60-63
Construction Technology of Sliding Layer and Extruded Sheet upon Bridge of CRTS-Ⅱ Slab Ballastless Track
ZHENG Xian-qi
..............
page:12-15
Feasibility Analysis on Sewage Source Heat Pump System Used for Guangzhou Railway Station
WANG Xi;DENG Zhi-hui;CHENG Wen
..............
page:129-132
Study on the Issues of Switch Equipment Selection in Electrified Railway
ZHAI Tie-jiu;TU Da-shi;WANG Yan-nan
..............
page:106-111
Numerical Simulation of Tunneling Process of Seven Steps Bench Method in Small Clear-Distance Twin Highway Tunnel with Eight Lanes
ZHANG Qiang-feng;ZHANG Wen-ting
..............
page:91-95
Influence factors on Vertical Load-Carrying Natural Frequency of Railway Double-Track Continuous Steel Truss Girder Bridge
REN Jian-ying;SU Mu-biao;LI Wen-ping
..............
page:32-35
Research into Several Issues in Route Design of Harbin Metro Line 3
BO Qing
..............
page:16-19
Study on Anti-interference of Train-Wayside Wireless Communication Transmission in Metro Signal System
ZHU Guang-wen
..............
page:112-116
Analysis on Structural Behaviour of Continuous Girder Bridge in Ganju Railway Station
WANG Xiao-li
..............
page:49-52
Bridge Design and Research on Elevated Station in Shanghai-Nanjing Intercity Railway
GONG Jun-hu;WANG Ting-zheng
..............
page:36-39
Study on Production Technology of Concrete Turnout Slab with Embedded Casings for Passenger-Dedicated Line
ZHU Na
..............
page:20-22,26
Study on Hot Smoke Testing and Evaluation for Typical Station in Xi'an Metro Line 2
LIU Geng
..............
page:133-136
Numerical Analysis on Vibration Characteristics of Track with Longitudinal Sleeper
CUN Dong-dong;ZENG Jing;QI Lin
..............
page:8-11,15
Restoration Design for Railway Bridge Pier's Displacement Caused by Ground Loading
LI Qian-ming;ZOU Xiang-nong
..............
page:67-70
Key Technology of Prefabrication of Tube Segment Used for Large-Scale Immersed Tube Tunnel with Soft Foundation
DAI Jing-hui
..............
page:87-91
Design and Construction of Double Wall Steel-Boxed Cofferdam for Offshore Pile Cap
WANG Xiao-jing;MA Xing-zheng
..............
page:45-48
Talking about the Subgrade Design Standand of the First High-speed Railway in the Middle East Area
LI Suo-ping
..............
page:23-26
Key Construction Technology of Intersection Point between Inclined Shaft and Main Tunnel of Dongliangpo Tunnel in Shanghai-Kunming Passenger-dedicated Line
REN Hao;BIAN Peng-fei
..............
page:96-97,105
Research on Digital Substation and Its Application in Railway Power Supply System
WANG Xiang-dong
..............
page:98-101
Research into Engineering-Geological Investigation on Bid Section M3 of Algeria East-West Expressway
HAN Xin
..............
page:27-31
Research into “5T” System Layout of Baotou-Dabaodang Section in Baotou-Xi'an Railway Passage
XING Xi-jun;MA Xue-tao
..............
page:137-140
tie dao biao zhun she ji dian xing can kao wen xian fan li
..............
page:132
Design of Unsymmetrical Long-unit Continuous Prestressed Concrete Girder Bridge in Passenger-dedicated Line at High Seismic Intensity Zone
LIU Hong-zhan;LIU Ai-qiao;YAO Jun-fang
..............
page:52-55
Technical Research on Overhead Contact System of Xi'an Metro at Ground Fissure Area
TANG Xiao-lan
..............
page:101-105
Research into Simulation Method of Train Operations Tracing on High-Speed Railway
ZHOU Yan-hong;TANG Jin-jin
..............
page:116-120
Structure Analysis of Monolithic Foundation Used in Slab Culvert and Arch Culvert
YUAN Xin-wen
..............
page:63-66
Stiffness Homogenization of No.12 Single Turnout with Fixed Frog and High Manganese Steel Used in 75 kg/m Rail
CHEN Rong;WANG Ping
..............
page:1-5
Monitoring and Analysis on Integral Slipping Construction for Steel Structure of Canopy at a Railway Station
ZHANG Guo-hui
..............
page:126-128
Study on Development Characteristics and Treatment Scheme of Xiangshuiping Underground River of Yesanguan Tunnel in Yichang-Wanzhou Railway
MIAO De-hai
..............
page:75-79
Technical Study on Settlement Control of Super Shallow-Buried Railway Tunnel Passing beneath the Existing Railway by Small Angle
YUE Ling
..............
page:80-82
Research on Sleeper Locating Technology of High-Speed Railway
ZHU Hong-tao;LIU Guang-lu
..............
page:5-7
Research on Mechanical Behaviour of Shield Tunnel Segments in Soft-Hard Uneven Strata
ZHANG Heng;CHEN Shou-gen;CHEN Liang
..............
page:83-86,95
Research on Design for Integrated Building-Bridge Elevated Station in Dongguan-Huizhou Intercity Rail Transit
YOU You-neng
..............
page:121-125,136