Home
|
Survey
|
Payment
|
Talks & Presentations
|
Job Opportunities
Journals
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
Railway Standard Design
1004-2954
2011 Issue 5
Applications of Whirly Sprayed Piles with High Pressure in Construction of Fuchunlu Station in Hangzhou Metro
Mao Hongmei
..............
page:91-93
Discussion on a New Kind of Induction Heat Thawing System for Turnouts as Well as Its Applications
cui ning ning ; dong zuo ; wang tie jun
..............
page:119-122
Realization of Software Switch in Thermal Standby System of Single or Double Servers at TDCS Station
zheng wen yu ; zhu na min ; chen yan bing
..............
page:122-124
Design on Inspection Base for EMUs Depot in Wuhan
Han Yongjun
..............
page:110-112
Options and Analysis on Ventilation and Air-conditioning System at Station on Shanghai Metro Line M7
Chu Hairong
..............
page:112-115
Technology for Construction of Long Pipe Roof for Tunnel Undergoing through Main Line of Highway
Fu Siliang
..............
page:69-70,75
Design on Continuous Beam Arch Compound Bridge on Some High Speed Railway
Chen Xiaobo
..............
page:60-62
Analysis on Main Designing Parameters of Dashengguan Yangtze River Bridge in Nanjing
cha jing ping ; mei da peng
..............
page:50-52
Analysis on Limit Element Numerical Simulation for Construction Order of Double Arcade Tunnel with Side Pressure in Shallow Depth
tang wei ; zhang hong zuo
..............
page:62-66
Analysis on Influence of Newly Built Tunnel on Existing Tunnel as Well as Treatment Measures
xie yong tao ; yu qing hao ; ding xiang ; lu yu jie
..............
page:87-91
Technology for Construction of Brackets for Portal Pier Capping Beam on Chengdu-Mianyang-Leshan Passenger Dedicated Line over Existing Baoji-Chengdu Railway Line
Wang Haiwang
..............
page:45-47
Relevant Issues on New Railway Lines Led into Terminal
Cui Yongming
..............
page:5-7
Design on Water Prevention and Drainage in Railway Tunnels
Ma Zhifu
..............
page:76-79
Scale on Hongmei Girder Manufacturing Base for Guangzhou-Dongguan-Shenzhen Urban Mass Transit
Zhang Ping
..............
page:56-59
Methods for Confirmation of Engineering Investment in Preliminary Feasibility Study on Railway Engineering
Li Yiqun
..............
page:116-118
Analysis on Calculation of Foundation Pits and Monitoring Results at Pengbu Station in Hangzhou Metro
Lei Chong
..............
page:79-83
Design on a New Kind of Bridge without Beam Slabs
ren liang ; fang zhi ; shang guan xing
..............
page:35-38
Design on Cable Stayed Bridge with Swivel Construction Method on 6th Ring Road in Beijing City
Liu Yongfeng
..............
page:31-35
Design on Alignment of Huainan-Hefei Section on Shangqiu-Hangzhou Railway as Well as It Induction into Hefei Terminal
Yon Xinping
..............
page:1-4
Technology for Transformation of Facilities for Sewage Treatment in Manufacture Industry of Railway Locomotives and Rolling Stocks
di ji hong ; shi yu chuan ; cheng xue ying
..............
page:105-107
Precise Calculation of Hanger Length of Flexible Overhead Contact System
zhao hong yu ; mei gui ming ; fan hai jiang
..............
page:108-110
Technical Innovations and Optimal Design of Lifting Piers for 67 Typed of Railway Pontoon Bridge
Zhang Junying
..............
page:38-40
Analysis on Seismic Response of Some Railway Space Rigid Frame Structure
wu ai lan ; su wei
..............
page:48-50
Influence of Rain Seepage on Stability of Side Slope
Zhao Jinqian
..............
page:19-21
Treatment Measures for Snow Distress at K247 Cuttings along Tonghuo Railway Line
Zhao Xiaogang
..............
page:14-16
Problems in Inspection of Concrete Sleepers as Well as Suggestions for Improvements
Liang Zhijun
..............
page:17-18
Design and Analysis on a New Kind of Integrated Cast Guard Rail Plate
liu ya hang ; dai feng ; jing guo ; wang ping
..............
page:11-14
Discussion on Static Standard for Train Flow Intensity in Remote Through Direction in Technology for Train Marshalling Plan
Nie Yingjie
..............
page:7-10
Applications of WSS Grouting Construction Method in Construction Section with Mining Method Undergoing through Existing Shielding Section
Zhang Yu
..............
page:84-86,104
Design on Elastic Cable Anchorage Box in Steel Box Beam of Suspension Bridge as Well as Its Manufacturing Crafts
gu bi feng ; chen ce ; ding lei
..............
page:53-55
Limit Element Analysis on Construction Process of Repairing and Reinforcement of Tied Steel Pipe Arch Bridge Deck
zhang shang ; li feng qin
..............
page:41-45
Evaluation on Influence of Noises along High Speed Railway
Su Weiqing
..............
page:100-104
Underpinning Technology for Pile Foundation of Shenzhen Metro Line 3 Connected with Guangzhou-Shenzhen Railway Bridge
chen an sheng ; wu yi
..............
page:71-75
Discussion on Horizontal Vibration of Deck Steel Plate Girder Bridge before and after Reinforcement
li wen ping ; ren jian ying ; su mu biao
..............
page:28-30
Design on Wind Loading of Canopy without Platform Columns at Station
Jiang Fan
..............
page:94-96
Discussion on Stability of Loess Side Slope with Influence of Suction
fu xin ping ; ding yong
..............
page:21-25
Tests on Wind Loading Properly of Canopy Structure on Average at Beijing South Railway Station
Zhao Jianhua
..............
page:97-100
Design on Deda Railway Line Undergoing through Beijing-Shanghai High Speed Railway
li nai zhen ; zuo wei
..............
page:25-27
Optimal Design on Cross Section of Qiantangjiang Tunnel on Hangzhou-Changsha Passenger Dedicated Line
Han Xiangyang
..............
page:66-68