Home
|
Survey
|
Payment
|
Talks & Presentations
|
Job Opportunities
Journals
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
Railway Standard Design
1004-2954
2003 Issue 7
An Exploration of Construction Technology for Lime-modified Dilatable Soil Subgrade
dai xi hong ; you chang long
..............
page:7-8
Determination of Design Parameters for Horizontal Curve of Metro Lines
ou yang quan yu
..............
page:5-6
Railway Lines/SubgradeAn Analysis of the Selection of Design Parameters for High-speed Railway Structures
wang xing zuo ; zhang zuo ; han qi meng
..............
page:1-4
Construction of Aeolian Sand Filled Road Subgrade at Desert Area
li jian
..............
page:9-10
Strengthening of Soft Soil Subgrade by Vacuum Pre-compaction Method
yuan guang long
..............
page:11-12,18
Necessity of Speed Increasing of Changchun-Tumen Line and Recommended Implementation Program
liu yan xin
..............
page:13-15
An Analysis of Stable Bearing Capacity of Long Span Steel Tubular Concrete Arch Bridge
yan quan sheng ; xu sheng qiao
..............
page:16-18
Design Characteristics of Dongying Yellow River Highway Bridge
li bing
..............
page:19-21
Technological Research over Medium and Small Span Long Connected Continuous Girder Bridge
song shun chen ; wang zhao zuo ; niu yuan zhi
..............
page:21-25
Design of Multiple Main Truss Cradle for a PC Cable-stayed Bridge in Lanzhou
wang guo zuo
..............
page:26-28
Erection of Bridge Girders Overcrossing a Electrified Railway by an Auxiliary Bridge
gao rong feng ; xiao yu tai
..............
page:29-32
Control of Cracks on Concrete Lining of Large Span Cavern
wang zhan long
..............
page:32-33
Design of Reinforced Concrete Single Cylindrical Piers for Jointless Single Track Railway
shi wei
..............
page:34-37
Rapid Construction with High Quality of High Bridge Piers for Railways at Northwest Area of China
liang jin bao
..............
page:37-39
Application of Hydraulic Slip Form to Construction of Double Thin-walled High Piers
zhang ai jun
..............
page:40-42
Design of Movable Arch Centring for Shuanghekou Bridge on Wanliang Expressway and its Construction
tang xin hua
..............
page:42-43
Wind Resistance Design for Lizigou Extra-large Bridge During its Construction
zhang shi an
..............
page:44-47
Research over and Control of the Transversal Rigidity of 40m Span Half-through Steel Truss
yu zhong ming
..............
page:47-49
Exploration of Design of Riverain Railway Bridge in Mountainous Area
fu xiao zuo
..............
page:49-51
Erection of the Steel Tubular Arch Rib of Diaozhongyan Extra Large Bridge
li hua ; gao yong li
..............
page:52-53
Application of Ground Surface Dynamic Well-point Dewatering Method to the Sand Stratum Section of Shenzhen Metro
xue mo mei ; deng dun yi
..............
page:54-56
Construction Technology for Vertical Shaft of Shenzhen Metro
huang jun ; yang xiao li
..............
page:56-58
A Comparative Study on Two Advance Pre-support Technologies for Ground Settlement Control
gao cheng lei ; zhu yong quan
..............
page:59-61
Ventilation Technology for Portal Construction of Jindong Tunnel
wu hong bo
..............
page:62-63
A Study on Wet Shotcreting Technology and its Application
nong sheng he
..............
page:64-65
Construction of a Frame Structured Grade Separation Bridge at the Location of Existing Bridge on Speed-increasing Main Line
lv zhi ming
..............
page:66-67
An Exploration of Forcing Conversion Technology for Shallow-buried Subsurface Excavated Metro
dai xian qiang ; zhang hong zhong
..............
page:68-70
Some Experience on Design of Regulating Reservoir, Sedimentation Basin and Oil Separation Tank
luo cui hua
..............
page:70-71
Changing the Fixed Boom of a 160t Railway Crane into Telescopic Boom
li zhi cheng
..............
page:72-73
Application of Numerical Analysis Technology to Flood Control Design of Railways
zhang hong xu
..............
page:74-75
Protection of the Overhead Contact Line Equipment of Harbin-Daliang Electrified Railway
ai bing
..............
page:76-77
A Brief Description of Local Equipotential Wire Connection in Toilet
xu hong ping
..............
page:77-78
Construction Technology for Cast-in-situ GRC Form Concrete Rib Floor
shi xu ping
..............
page:78-80
zhi shi chuang
..............
page:53,61