Home
|
Survey
|
Payment
|
Talks & Presentations
|
Job Opportunities
Journals
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
Railway Standard Design
1004-2954
2002 Issue 2
An analysis of the influence of pier and abutment's stiffness on vibration of bridge span
li shou long ; wu ding jun
..............
page:1-3
The erection of a 42m precast segmental box girder with DP450 bridge girder erecting equipment
zhang zhi hua ; xiong chun kui
..............
page:4-6,10
Application of special bridge structure to Shanghai-Nanjing section of Beijing-Shanghai high speed railway line
xie wei zuo
..............
page:7-10
A summary of the development of travelling trestle bridge fabrication machine in China
liu jia feng
..............
page:11-15
Equipment support for quick construction of a rigid frame-continuous beam bridge
huang jian
..............
page:16-18
In-situ cast of 32m simply-supported box girder
qiu feng yun
..............
page:18-19
The construction of a large span tunnel with shallow-buried tunnelling method in soft rock
wang xin xian ; mou ya zhou
..............
page:20,46
Consolidate track structure to meet the need of train speed increase
hou de jie ; pu bao xin ; tao lian ming
..............
page:21-22
A brief introduction to standard drawings of 10 kV Power Distribution Station for Railway (electromagnetic protection)
shen xu yan ; zeng qing yi
..............
page:40
Develop domestic small track maintenance equipment through introducing advanced foreign technology
rong xiao bo
..............
page:41-42
Design and field test of CFG pile composite foundation
lou guo chong
..............
page:43-44
Controlled blasting in cut of newly built second line to existing electrified railway line
wang wen feng
..............
page:45-46
The technical and economic analysis of application of platform shielded gate to subway environmental control
wang lan ; zheng hong bo ; feng lian
..............
page:47-48
A study on influence of short fiber over the freezing-resistant and deterioration-resistant property of cement-based material
peng cheng
..............
page:49-51
Digging foundation pit close to residential buildings by shallow hole short-delay controlled blasting
wang su jing ; yu jin hua
..............
page:51-52
Computation and analysis of the switching power by multipoint traction
wang ping
..............
page:23-25
Pile foundation construction in Karst zone covered with liquefied sandy soil
gao fa zheng
..............
page:26-27
Consolidation of high steep slope with hard geological conditions
xue xin guang
..............
page:28-30
A new method of foundation soil treatment
jiang jia bin
..............
page:31-32
An exploration of broad sleeper railway line at large passenger stations
guo zhan wei ; ding ai guo ; wang pei qin
..............
page:32-34
A transitional construction program of line in technical upgrading of a large railway station
huang jiang ping ; yang dao zuo
..............
page:35-37
Selection of voltage of power supply for electrified railway line
yu zeng ; xiao zhi qiang
..............
page:38-39