Water Resources and Hydropower Engineering
1000-0860
2011 Issue 5
Analysis on compensation for award postponement of Contract(TSQ - 1/C3) for construction of TianshengqiaoⅠHydropower Station
WANG Baolong;ZHANG Sen
..............
page:7-9
Application of decision theory to project bid and tender
DENG Youfu;L(U) Qiang
..............
page:27-29
Construction technology for rock-bolted crane beam of underground powerhouse of Lechangxia Water Control Project
ZHANG Yu;WEN Jie
..............
page:12-14
xin xi dong tai
..............
page:6,11,70,79,96,99,103
Construction scheme of tunneling through F《,6》 fault during construction of Jinping Hydropower Station Ⅱ
QU Changlin;WANG Yajuan
..............
page:71-76
Discussion and analysis on risk of construction enterprise
GAN Xuewen
..............
page:39-40
Comparative selection of anti-seepage method for open diversion channel of Zhentouba Hydropower Station Ⅰ
LIANG Rixin;JIANG Jianlin
..............
page:84-87
Brief discussion on management of construction machinery by project management office
MA Jianping
..............
page:57-58,76
Review on management of filling quality for concrete face rock-fill dam of Sujiahekou Hydropower Station
LIU Pan;TANG Fenfen
..............
page:59-62
On cost control of construction project
LIU Lian
..............
page:21-23
Reform and inspiration of fair value measurements of post financial-crisis era
CHEN Liang
..............
page:32-36
Problems frequently encountered in materials management of hydropower construction enterprise and their countermeasures
WEI Yanting
..............
page:63-64,83
Construction technology of shallow-buried and subsurface excavated culvert under complicated geological condition
HAN Lixia;SUN Bo
..............
page:88-90
Merging grouting technology for joint grouting of Goupitan Arch Dam
ZHOU Qiang;YIN Haidong
..............
page:49-53
Selection and quarrying planning of filling material source for construction of Nuozhadu high central core earthrockfill dam
HUANG Teng;WU Gang
..............
page:15-17
Application of fiber concrete to mass concrete construction
LI Chunyan
..............
page:41-42,56
Application of percussion drill to construction of pilot heading for excavation of gate shaft of Nuozhadu Hydropower Station
YANG Xicheng;GUO Chao
..............
page:10-11
Experiment of cover-weight anti-seepage consolidation grouting for No.3 water diversion tunnel of Jinping Hydropower Station Ⅱ
XIE Huadong;L(U) Lingli
..............
page:97-99
Simulation and inspection of concrete lining construction for bending of diversion tunnel of Jinping Ⅱ Hydropower Station
SONG Dongfeng;RAN Ruigang
..............
page:77-79
Prevention and treatment of concrete cracking
LIU Pengfei;ZHANG Yinyao
..............
page:43-45
Construction of foundation curtain grouting for dam of Nuozhadu Hydropower Station
WANG Jiang;WANG Hui;LIANG Longqun
..............
page:24-26
Placement scheme of roller compacted concrete for construction of Shatuo Hydropower Station
OU Meihua;HOU Guofeng;LUO Gang
..............
page:30-31,36
Discussion on implementation of accounting concentration check in enterprise
SHEN Hongbo;WANG Jing
..............
page:37-38,48
Application of hydraulic slipform to concrete construction of gate pier of Sanwan Water Control Project
LI Zhipeng;WANG Shunli;YUE Geng
..............
page:46-48
Scheme selection for construction of Luwan Product Oil Pipeline through special area
DING Xiwu;YONG Wei;HE Bowen
..............
page:94-96
Application of slip-form for inverted arch to C3 Bid Section of construction of Jinping Ⅱ Hydropower Station
TIE Junfeng;ZHAO Zhixuan
..............
page:4-6
On risk prevention and control of enterprise financial affairs under cash flow
HAO Hairong;SUN Bing
..............
page:91-93
Study on quarrying scheme for construction of Pubugou Hydropower Station
LI Guanglong;LIANG Rixin
..............
page:1-3
Construction technology for temperature control of bedding concrete for core-wall in Nuozhadu Dam
ZHANG Lining;CHAI Xizhou
..............
page:18-20,26
Automatic control of aggregate processing system for construction of Zhentouba Hydropower Station
XIONG Zhongheng;L(U) Jixing
..............
page:100-102
Inclined layer construction technology for RCC placement on right bank of Guanyinyan Hydropower Station
WANG Wei;WANG Chaoyang;LUO Bin
..............
page:68-70
Construction technology of abrasion-erosion resistance concrete for side-wall of cushion pool of Goupigou Hydropower Station
QIN Baijun;DENG Youfu
..............
page:54-56
Simulation analysis on temperature field of RCC over-flow dam section of Guanyinge Hydropower Station
LU Bing;CHEN Lin
..............
page:65-67
Safety design and calculation of high slope support-bent for concrete production flooring system on left bank of Liyuan Hydropower Station
LIU Li;JIANG Yufu
..............
page:80-83