Bridge Construction
1003-4722
2009 Issue z1
Construction of Middle and Lower Legs of South Pylon of Sutong Bridge
LI Song;LI Lin;GAO An-rong;XU Peng;LI Hao-tian
..............page:1-3,7
Construction Techniques for Concrete Boxed Cofferdams of Pile Caps of Non-Navigable Bridge of Qingdao Bay Bridge
MI Chang-jiang;SONG Lai-dong;BAI Li-feng;DU Qing
..............page:55-58
Comparison and Application of Cofferdams for Pile Caps of Non-Navigable Bridge of Qingdao Bay Bridge
BAI Li-feng;CAO Xiang-dong;LI Peng;SONG Lai-dong
..............page:50-54
Construction Technology and Quality Control of Rotating Excavation of Large Diameter Pile Foundations in Sea
DONG Tao;CHENG Jian-xin;ZHANG Zhi-wei;CAO Xiang-dong
..............page:39-42
Lifting and Installation of Steel Box Girder at Pylon and Girder Section of Edong Changjiang River Bridge
OUYANG Xiao-yong;ZHANG Jian-jun;GAO An-rong;WANG Jia;XU Peng
..............page:32-35
Design and Research of Mix Proportioning for C55 High Performance Concrete of Hybrid Girder Cable-Stayed Bridge
XIAN Jian-ping;MI Chang-jiang;CAO Xiang-dong;ZHOU Min
..............page:36-38,54
Design of Boring Platform for Main Pier No.5 of Edong Changjiang River Bridge
LI Song;GAO An-rong;ZHAO Peng-lei;LI Lin;WANG Bei-chen
..............page:15-17
Design and Construction of Steel Pipe Cofferdam for Pile Cap of Main Pier No.5 of Edong Changjiang River Bridge
CAO Xiang-dong;ZHANG Jian-jun;LI Song;GAO An-rong;ZHOU Min
..............page:18-22
Application of Central Point Single Targeting Method to Observation of Settlement of High Steel Pipe Supports
NIE Ning;ZHAO Hai-yang;CAO Xiang-dong;LI Peng
..............page:59-61
Techniques for Synchronized and Integral Lowering of Movable Shuttering Form by Hydraulic Continuous Jacks
XIAN Jian-ping;WANG Ting;YANG Min;CONG Pei-shan
..............page:8-11
Design and Construction of Large Temporary Works over Water for Edong Changjiang River Bridge
ZHANG Jian-jun;LI Lin;GAO An-rong;RAN Ya-fei
..............page:12-14,22
Key Techniques for Construction of North Anchorage Caisson Foundation of the Fourth Nanjing Changjiang River Bridge
ZHAO You-ming;TIAN Xin;NIU Ya-zhou;HAO Sheng-li
..............page:62-65,79
Feasibility Test for Jacking Root Studs of Root Type Caisson Foundation Under Water
OUYANG Zu-liang;XIAN Jian-ping;WANG Gen-sheng;ZHANG Wei;LI Hua-long
..............page:73-75
Test for Sinking Caisson Foundation by Vacuum Negative Pressure
YANG Min;MI Chang-jiang;WANG Bo;XING Hai-jun;HONG Yan
..............page:76-79
Scheme Comparison for Construction of Large Diameter and Long Steel Casings on Land
ZHANG Li-kui;MI Chang-jiang;OUYANG Zu-liang;XIAN Liang
..............page:70-72