Inner Mongolia Electric Power
1008-6218
2014 Issue 4
Measurement to Maintain Market Share of Inner Mongolia Power(Group) Co.,Ltd.
Tao Kai;,Wang Jing;,Wang Zhijian;,Zhao Jianping;
..............
page:1-4
The Effect of Low Voltage Ride Through Test Impedance Variation to Grid Current of Wind Turbines
Gong Weiwei;,He Fang;,Wang Yueyuan;,Zhang Shuyu;,Zhao Yongfei;
..............
page:5-9
Research on the Testing of Low Voltage Ride Through Capability of Auxiliary Engine Converter of Power Unit
Dong Yongle;,Qi Jun;,Tao Jun;,Yang Baofeng;
..............
page:10-15,23
Research on Metal Technical Supervision and Inspection Code for Equipment of Wind Farm
Chen Hao;,Tian Linan;,Zhang Tao;,Zhang Yanfei;
..............
page:16-19
Analysis and Precautions of 500 kV Overhead Line Trip in West Inner Mongolia Power Grid
Xue Bin;,Zhang Dong;
..............
page:20-23
Design and Implementation of Intelligent Pre-warning System for Power Grid Based on Integrated Dispatch and Control
Hu Huaiwei;,Ren Tao;,Wang Meizi;,Zhang Gang;
..............
page:24-27,45
Application Research of Data Mining in the Condition-based Maintenance of Transmission Line
Guo Yali;,Luo Chang;,Zhao Baozhu;
..............
page:28-32,36
Operation Economic Analysis of Unit Exhaust Steam Waste Heat Recovery System under Designing Pressure
Bao Qishisan;,Guo Gang;,Sarengaowa;
..............
page:33-36
Analysis of Reasons that Power Plant Fast Cutting Device cannot Changeover Automatically
Wang Chunyu;
..............
page:37-40
Reformation on Two-in-one of Induced Draft Fan and Booster Fan of 300 MW Units
Zhang Xilai;,Zhang Zhong;,Zhi Guoqing;
..............
page:41-45
Problems Analysis and Its Solution Measures on DCS of Power Generation Unit
Hou Yongjun;,Li Qiang;,Liu Hai;,Suo Jianqi;,Yu Lihong;
..............
page:46-48,52
Analysis and Treatment of the Leakage on Reheater on 300 MW CFB Boiler
Yang Yanqing;
..............
page:49-52
Variable Pitch System Transformation on Z72-2000 Type Wind Turbine
Zhang Guoya;
..............
page:53-55
Analysis and Treatment of Total Hydrocarbon Overweight in a 220 kV Main Transformer
Zhou Huidong;
..............
page:56-59,69
Model Optimization and Application on a 180 MW Mixed-flow Hydro-turbine and Its Water Diversion System
Li Xiaobo;,Liu Zhaotong;,Zhang Shenbin;
..............
page:60-63
Construction and Application of On-line Monitoring System of Transmission Line
Jin Lei;,Liu Zhilin;,Yan Jun;,Zhang Jie;,Zhang Wei;
..............
page:64-69
Nicolet DIMENSION 4i Data Acquisition Analyzer Application in the Test of Power Industry
Su Changqing;,Wang Hui;,Wang Lei;
..............
page:70-73,77
AGC Command Signal Rapid Response Function Optimization on 600 MW Unit
Wang Guanglong;,Xiao Geyuan;,Zhang Zhenxing;
..............
page:74-77
Development and Application on Temporary Backstop Device of Suspension Clamp Connecting Bolt in Transmission Line
Cao Guowen;,Zhao Hao;
..............
page:78-80
Protected Measures of the Upper Reservoir of Hohhot Pumped-storage Power Station in Winter
Li Wei;,Liu Yan;
..............
page:81-84
Analysis and Treatment of Common Faults in Inner Mongolia Power Information Network
Jia Hong;,Li Yindong;,Tian Chongjun;
..............
page:85-88
Issues and Treatment Advices on Technical Supervision for Flue Gas Desulfurization in Thermal Power Station
He Fulong;,Wuyunsiqin;,Zhang Chenggang;
..............
page:89-91,95
Analysis and Processing of Vibration Fault on Power Generation Unit Exciter
Jiang Jianxun;,Li Xiaobo;
..............
page:92-95
Numerical Simulation Research on Ignition System for CFB Boiler
Bao Qishisan;,Chang Tianshu;,Wang Wen;,Yue Jianhua;
..............
page:96-100
xin xi dong tai
..............
page:前插1