Opencast Mining Technology
1671-9816
2015 Issue 5
Simulation research on slope stability in Yimin Open-pit Mine
HAO Zhe;,WANG Laigui;
..............
page:1-4
Slope stability evaluation based on Sarma method in open-pit mine
TIAN Yanzhe;,XU Shuanhai;
..............
page:5-7
Technology analysis of oil shale reducing tailings incidence in open-pit mine
YIN Ji;,WANG Mingjun;
..............
page:8-11,14
Non-working slope engineering geological investigation in Jilangde Open-pit Mine
SUN Xizeng;
..............
page:12-14
Harm and control measures of surface constant flow in non-working slope
JIA Hongjun;,SHI Lei;,LYU Kuan;
..............
page:15-17
Stripping semi-continuous system crushing equipment selection in Shengli East No.2 Open-pit Coal Mine
YAO Gelin;,BAO Hui;,WANG Shougong;
..............
page:18-21
Causes and control measures of blasting slungshot
LI Yi;
..............
page:22-25,29
Cost reduction scheme in Xinjiang Biesikuduke Open-pit Coal Mine
SUN Xin;
..............
page:26-29
Effect of blasting on slope in Pingzhuang West Open-pit Mine
FEI Yupeng;
..............
page:30-32
Joint fractured rock mass millisecond interval time blasting experiment
LI Shifeng;,ZHANG Zhengcheng;
..............
page:33-35,38
Successful derivation method of dump under sector steering conditions in Yimin Open-pit Mine
LI Wei;,DUAN Shu yi;
..............
page:36-38
Coal conveying belt edge wear machine vision non-destructive on-line detection
LIU Yinxia;,LI Si;,WANG Dong;,ZHANG Huibo;
..............
page:39-41
Determination of structure surface and key block based on digital photogrammetry and its three-dimensional reconstruction
WANG Tao;,SUN Qifei;,ZHOU Jingren;,HOU Xiangang;,HU Gaojian;
..............
page:42-45
Truck dispatching system construction based on private cloud
SHI Guofeng;,ZHANG Liansuo;,YANG Xinghai;
..............
page:46-48
Blasting parameters intelligent design system in Heidaigou Open-pit Coal Mine
LI Fuping;
..............
page:49-51,59
Serialization design of belt conveyor idlers group
HUANG Xin;,XIE Qingjun;,ZHANG Qiongzhe;
..............
page:52-55,59
Failure analysis and improvement measures of WK-35 shovel pushing pressing mechanism
ZHANG Huaming;
..............
page:56-59
PH2800XPB electric shovel guide wheel assembly transformation
HE Dong;,ZHANG Xiaofeng;,SHANG Yu;
..............
page:60-62
Survey system based on CORS technology in Baiyinhua Coal Company
LIU Lijun;,FENG Shuqing;,ZHANG Xuyu;
..............
page:63-65
Open-pit mine dust prevention under Gobi environment
WANG Zhongxin;,ZHAO Dandan;
..............
page:66-68,71
Practice of building green mines in Zhundong Open-pit Coal Mine
LIU Shaofei;
..............
page:69-71
Goat governance under Etuokeqi special geological conditions
WANG Wei;,LI Wei;
..............
page:72-74
Current situation and countermeasures of construction project cost management
HE Meilan;
..............
page:75-77
Effective collection of enterprise archives
WU Yanxin;
..............
page:78-80,84
Effect of labor cost on equipment selection in Australia Open-pit Mine
LIU Yinglu;
..............
page:81-84
Importance of feasibility research work in the prophase work of coal mine project
GAO Nan;,YANG Honghai;,JIANG Wen;,SI Guobin;
..............
page:85-86,90
Feasible analysis on stripping outsourcing in Yimin No.2 Open-pit Mine
ZHANG Tianjiao;
..............
page:87-90
Application of internal control management system in open-pit coal mine
ZHANG Yue;,QI Jinbao;,LIU Haiping;
..............
page:91-93
Discussion on emergency plans management work practice
WANG Shidong;
..............
page:94-96