Jilin Electric Power
1009-5306
2006 Issue 1
can kao wen xian zhu lu ge shi
..............
page:12
One New Type Of Electrified Railway Line Protection Device
Ren Liru;Cang Hongtu
..............
page:54-56
Development and Application of Floating Bead Collected from Coal Ash
Yu Zhiwei
..............
page:51-53
Application of FOPLC on Chemical Water Treatment Program Control
Zhang Dafeng
..............
page:49-50
Analysis on Oil-in Problem of 600 MW Steam Turbine Generator
Zheng Han;Yang Yang
..............
page:46-48,50
Discussion on Electrostatic Ring in the Main Insulation Constuction of Power Transformer
Lu Changbai;Wang Qingxu
..............
page:24-26
Approach of Duffing Oscillator Directional Relay Detecting Fault in Transmission Lines
wang zuo ; luo hong xia ; zhang xue feng ; li tian yun
..............
page:21-23,39
Research on GPRS Technique of Distribution Automation System
Lei Yuling;Lei Yuzhuang;Nie Fang
..............
page:19-20
Study on Figure Supporting Flat of Dispatcher Training System
Wang Xiuyun
..............
page:16-18
Application of Multi-objective Random Chance-constrained Programming in Power Distribution System Reconfiguration
Li Lu;Zhou Yuhui
..............
page:13-15
Research on Fault Location Algorithm of T-connection Transmission Line
Wang Zhigang;Wang Shuangshou
..............
page:10-12
Research on Enhancing the Interrupting Current of SF6 Breaker Under Low-temperature Operation
Huang Tao;Jiang Dianbo;Yan Hao
..............
page:8-9,45
Research on Interruptible Load Management in Electricity Market
Tian Jingtao
..............
page:6-7,42
Protection Against the Lightning Strike ,the Wind and the Pollution Flashover on Overhead Transmission Line
Ji Xinyuan;Li Yongshuang
..............
page:1-5
Analysis and Treatment on Sol Impurity Soluble in Oil after Hoisting the Transformer Cover
Kang Liang;Wang Bing
..............
page:43-45
Measures of Preventing Power Failure Completely in Primary Substation
Cao Qi;Jiang Dianbo
..............
page:40-42
Analysis of Field Arcing Fault on Electrostatic Precipitator and its Modification
Zhang Jiqing;Huang Rui
..............
page:36-39
Realization of Remote-viewing Technology in Unattended Substation
Han Chi;Liu Xiaowei
..............
page:33-35
Problems and Treatments in Precipitator of Home-made 600 MW Units
Wei Wei
..............
page:30-32
Development of Network Front-end Computer in EMS of Jilin Electric Power Dispatching Center
Ma Lixin;Meng Yongliang;Zhang Hanshu
..............
page:27-29