Home | Survey | Payment| Talks & Presentations | Job Opportunities
Journals   A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
Jilin Electric Power
1009-5306
2002 Issue 5
qi ta
..............page:13,16,21,42,附页1-附页2
Method of Design with Quota and its Process Control
LI Juan
..............page:55-56
Mounting of Combustion Devices on Circulating Fluidized Bed Boiler
LU Feng-chao;CHEN Xiao-hai
..............page:52-54
Analysis of Miss Operation of Microcomputer Reclosing on By-pass Bus
QI Chang-hong;ZHENG Guang-feng;GUO Wen-ge
..............page:50-51
Prevention of Failure for GIS
PENG Qin-jian
..............page:48-49
Retrofit on Body of Type N300-16.7/537/537 Turbine
PAN Heng-xi;XUE Xiao-feng;SONG Li-bin
..............page:40-42
Development and Application of Monitoring System in Automatic Machine Room with No-operator
XIAO Hui-xu;MA Li-xin;YAN Hai-kuan
..............page:38-39,54
Electric Energy Metering System and its Application in Changchun Grid
HAN Chi;CHANG Bai-cheng
..............page:34-37
Supervisory System of Link Line Between Jilin Grid and Northeast Area Grid
XIAO Hui-xu;ZHANG Qin-yi;LI Guang
..............page:32-33
Application of Water Sluicing on Transporting Ash in Ash-keep-site
MA Chao;GUO Feng-qi
..............page:26-28
Development and Application of Optimal Distributing System Between Thermal and Electric Load on Heating Units
wei hao ; song bao feng ; zhao wei dong ; wang zuo
..............page:24-25,47
Necessity of Building Linjiang 220 kV Substation
ZHAO Huan-ting
..............page:20-21
Discussion on City Grid Structure in Jilin
LI Tian
..............page:17-19
Discussion on City Grid Structure in Changchun
LI Gui-xian
..............page:14-16
Analysis on Transmission Capacity of Link Line Between Yanbian Grid and Main Grid
SHENG Da-kai;DONG Xiao-xin
..............page:10-13
Design on Program of Transforming 200 MW Condensing Units into Heating Units
CHAI Xiao-dong;SHEN Hong
..............page:5-7,31