Central China Electric Power
1006-6519
2003 Issue 5
Application of the Frequency Conversion Technology for Automatic Coal Allocation
lin yong ; si man zhou ; zhang liang
..............
page:73-74
Acid Dosing Process to Prevent Scale for the Ash Wash System
zhang jun wei
..............
page:71-72
Discussion of Supervisory Information System of plant
pei jun feng
..............
page:68-70
Analysis and Remedy of Rear Water Tube Failure Accidents of Longgang Power Plant's №1 Boiler
fang di ; fang li
..............
page:66-68
The Technique of Bored Together Pin Hole of Runner and Coupling Bolts to Main Shaft on Platfrom
pan bi rong
..............
page:63-65
Convection Superheater Structure Analysis
liu chun ; hu bo tao
..............
page:61-62
The Condition Calculation for Closing the Loop of Eletromagnetism of the Chenzhou and Hengyang 220/110/35 kV
zuo zi li
..............
page:58-60
Analysis and Contermeasures of Efficience of 420 t/h Boiler in Power Plant
li wen gen
..............
page:55-57,60
Development and Application of Power Supply Operation-order-sheet Expert System for Central China Electric Power Dispatching & Communication Center
luo shang yi ; zhang min wang ; yang min hao
..............
page:53-54
Discussion on Designing Computerized Monitoring and Control System of 500 kV Substations
sun zhi yun ; sun zhi sheng
..............
page:50-52
Lightning Protection of Power Plant Information System
guan jian min
..............
page:47-49
Analysis and Countermeasure of Cracking on the Radar Tube Sleeve of the Platen Superheater
yi zuo ; tang bi guang
..............
page:44-46
The Countermeasture and Advice of Construction of City Power Grid in Wuhan
zhang tao
..............
page:42-43
Reconstruction of Flow Passage Part of 125 MW Steam Turbine at Nanchang Power Plant
cheng guang jun ; deng chun sheng
..............
page:38-41
Influence of Different Method of Guazhi Hydro Station Joins Power Grid on Sanbanxi
xie xin tao
..............
page:36-38
Typical Accident Statistical Analysis of Central China Power Grid
li qun shan
..............
page:33-35
Analysis of the Virtual Earth Phenomena by Transfer Excess Voltage
shao yong
..............
page:30-32
The Coordination Method of Boiler and Turbine Load Control in a Unit Based on Energy Balance Principle
guo qiao ju ; zhu guo zuo ; zheng zhi bo ; feng yong bing
..............
page:25-29
The Influence of Drainage to Generating Unit Economy
di pei qiang
..............
page:23-25
Discussion on Untieing 500/220 kV Electromagnetic Ring Network in Hunan Power System in 2010
su zhi yang
..............
page:20-22
Consideration of Developing the MIS for Production Management in Central Company of State Power Co.
chen jian
..............
page:17-19,22
A Method for Discerning Inrush Current Based on Sequence Current
xu xian feng ; gong le nian
..............
page:15-16
The Design and Realization of On-line Formation System of Operation-Order-Sheet
chen zuo ; wang guo song
..............
page:11-15
Research on Flame Image Processing and Measurement of Radiant Energy for Boiler
wan xin fu ; xue yi ming ; zhou huai chun ; zhang hui ; cui yan feng ; yang chao ; luo zi xue
..............
page:7-10
Thermal-Stress Monitoring for 300 MW Steam Turbine Operation
huang ya luo ; ye yong song ; wang li lin ; li jiang hai
..............
page:4-6
Study on Several Problems of the Interconnection between Central China Network and Chuan-Yu Network
lin chang qing ; xiong xiu wen ; huang yong
..............
page:1-4