Home
|
Survey
|
Payment
|
Talks & Presentations
|
Job Opportunities
Journals
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
Traffic Engineering and Technology for National Defence
1672-3953
2015 Issue 4
An Introduction to Terrorist Attacks on Bridges and the Anti-Terrorism Design
Li Jian;,Wu Haijun;
..............
page:1-5,44
An Exploration into the Communications Support for the Organized March of Vehicle Units in the Plateau Environment
Liu Qianlin;,Ding Hongwei;
..............
page:6-9,44
Research on the Key Techniques of SGTJ170-Type Highway-Railway Bridge Erector
Xu Guangxing;,Zhang Ping;,Zhang Yaohui;
..............
page:10-13,44
On the Virtual-Prototyping-Technology-Based Design of the Working Arm of the Wet-Concrete Sprayer
Zhu Houjun;,Zhang Rui;,Wang Xiying;,Zhao Luhang;
..............
page:14-17
An Analysis of the Optimized Scheme for the Layout of the Floating Piers for 67-Type Railway Pontoon Bridges
Zhao Cunbao;,Wang Xiaodong;,Zhang Changguo;,Li Yu'an;
..............
page:18-21
An Overall Design for the Approach of Bridge Two of Humen
Xu Dezhi;,Wan Zhiyong;,Liang Linong;
..............
page:22-25
An Analysis of the Lagging Shear Effect of the Continuous Skewed Box Girder Bridge
Ren Rongxu;,Bu Jianqing;
..............
page:26-28,21
On the Full-Automatic Flow Technique of the Template Trolley for the Side Wall of a Subway Station
Zheng Dongsheng;
..............
page:29-32
The Monte-Carlo-Method-Based Analysis of the Importance of the Road Network Units in Different Sections of a Harbor
Zan Liang;,Pan Huazhi;
..............
page:33-36,32
An IGFAHP-Based Evaluation of the Vehicle Maintenance and Support Capacity
Zhang Mian;,Lv Jianxin;,Wang Dong;,Liu Yihao;
..............
page:37-39,52
Inspection Techniques for the Dock Outfitting and Watertight Construction of the Immersed-Tube Tunnel
Ren Hong;
..............
page:40-44
An Analysis of Unloading the Tensioning Loads of the Segment-Assembled Bridge Erector During Construction
Zhu Xiong;
..............
page:45-48
Construction Techniques for Laying the Overhead Tracks Dislocated with the 28-m TJB-Type Beam in Curved-Line Sections
Lin Yuntang;
..............
page:49-52
Analysis of and Countermeasures to the Malfunctions of the Air Conditioning System for Metro Vehicles
Wang Shuohe;,Xue Pingxing;,Zhang Liang;
..............
page:53-55,59,66
An Analysis of the Load-Bearing Capacity of the Roadside Ditches with Covering Slabs and Our Counter-Measures
Zhao Jian;
..............
page:56-59
On the Application of the φ500 mm Advanced Pipe-Roofing to the Tunnel Project of the Trunk Railway Under-Crossing the South-to-North Water Transfer Tunnel
Wang Ruxiang;
..............
page:60-63,69
On the Application of the Dry-Mixed Rubber-Asphalt Mixture to the Pavement Project of the Wuhua Road in Nanjing
Zhu Xiang;,Xu Qingquan;,Li Zhigang;
..............
page:64-66
On the Blasting-Aided Method to Remove Door-Type Rigid Frames
He Chuang;,Wang Hailiang;,Zhang Liang;,Zhang Lunan;
..............
page:67-69
On the Application of the Transporting-and-Erecting Machine to Erecting Girders on a Small-Radius-Curved Railway
Ping Shuanling;
..............
page:70-72,17
An Experimental Study of Detecting Underground Pipelines in Different Media with the Ground-Penetrating Radar Technique
Zhao Dejie;,Zhang Yongtao;,Yan Wenke;
..............
page:73-76,80
Tunneling Construction Control Techniques for the South-to-North Water Transferring Tunnel Project Under-Crossing a Trunk Railway
Fu Shufeng;
..............
page:77-80