Fujian Electric Power and Electrical Engineering
1006-0170
1999 Issue 2
Effect of Wrong Connection of Transformers on Measurement
Chen Mingjie
..............
page:70-72
Causes and Prevention Measures of Consume's Electrical Accidents
Feng Guiling
..............
page:68-69
Treatments of Defects and Faults on Insulation of No.4 Main Transformer at Shuikou Hydropower Plant
Lin Shiyong
..............
page:66-67
Quality Supervision and Management of Compound Insulators Used on Fuiian Grid
Zhang Junfeng
..............
page:1-2,11
State Monitoring and Prediction Maintenance of Turbo-Generator Sets
Tang Yangling
..............
page:3,26
Design of Urban Overhead Power Transmission Lines
Lin Jian
..............
page:24-26
Property Analysis and Economy Appraisal of Gas-Steam Turbine Combined Cycle Power Plant on Ship
Jiang Wenjiang
..............
page:27-28
Superficial Discussion on Establishment of Enterprise MIS
Ye Suping
..............
page:29-30,48
Boiler Flue Gas On-Line Monitoring System of Songyu Power Plant
Lin Jinbiao
..............
page:31-32,72
Superficial Analysis on Influence of Voltage Regulation to Line Losses on Rural Network
You Min
..............
page:33-34
Searching for Grounding Fault of Generator Stator Coils
Zheng Duan
..............
page:35-38
Design of Switching-out Generator Units for Overload Protection of Ping-Zhong Line
Wang Jianhui
..............
page:39-40,45
Selection for Mode of Single-Phase Grounding of 10 kV System and Control of Its Current
Chen Sihua
..............
page:41-43
Analysis on Starting Torque of Three-Phase Asynchronous Moter When One Phase is Wrongly Connected to the Neutral Line
Zheng Zhaotai
..............
page:44-45
Analysis on Continuous Pollution Flashover Tripping Accidents on Quanzhou Grid and Prevention Measures
Hong Quanzhu
..............
page:46,69
Probe on Mode of Boiler Blow-off of Huaneng Fuzhou Power Plant
Xu Xiao;Li Keqin
..............
page:47-48
The United Clock Used in Electric Power System and the Application of GPS
Hou Xiuyu
..............
page:49-50
Erection of No. 4 Boiler Drum of Huaneng Fuzhou Power Plant Second Phase Project
Zheng Yu
..............
page:51-52
Method for Alloy Elements Analysis of Main Steam Piping Sampled Witout Hurt
Zhang Wen
..............
page:53,56
Analysis on Explosion Accident of Water Wall Tubing of Yong'an Power Plant No.6 Boiler
Zhang Mingfang
..............
page:54-56
Coordination Problem of Bypass Micro-Computer Protection with Receive-Trasmitter Machines
Cai Meijie
..............
page:57,43
Retrofit of Hydraulic-Pressure Boost of Shaqikou Shiplock
Wang Fenge
..............
page:58-59
Superficial Discussion on Reliability Improvement of Micro-Computer Protection
Zhu Jing
..............
page:60-61
Suppressing Noise of Diesel Generator Sets
Lin Hui
..............
page:62-63
Application of Hydrochloric Acid Soaking Method on High Pressure Boiler Acid Cleaning
Chen Dan;Lian Bohuang
..............
page:64-65
Simulation Tests of Micro-Computer Automation Accurate Synchronizing Devices
Zhen Jidi;Lin Zhongling
..............
page:4-7,28
Analysis on Influence of Load Curve to Shape-Factor and Electric Energy Losses
Li Shaoxuan
..............
page:8-11
Analysis on Protection Performance after Errorneous Closing of Farthing Knife-Switch of Li-Wu line in Lilin Substation Was Turn On Wrongly
Hua Jianwei
..............
page:12-14
Existing Problems and Countermeasures of Thermal Automatic Control Systems in Zhangping Power Plant
Gao Guochang
..............
page:15-16,59
Existing Problems and Retrofit Measures of Boiler MFT Protection in Songyu Power Plant
Xia Qiu
..............
page:17-18,21
Reasonable Dispatching Fujian Reservoirs with Meteorological Data
Lin Meizhu
..............
page:19-21
GRAVER Condensate Deironing Filt System
Li Keqin
..............
page:22-23