Electric Power Construction
1000-7229
2008 Issue 8
Challenges in Digitized Substation Construction and Its Countermeasures
li zhen yu ; xu rong ; shang bin ; li hai bo
..............
page:111
Thermal Power Construction Development History in China(8)
YANG Qin-ming
..............
page:112-115
Information Service
..............
page:116-122
dong tai
..............
page:6,17,21,40,57,83,86,91,97,102,109
Application of Geogrid in 500 kV Ningguo Switching Station Construction
WU Wei-kang
..............
page:110
Analysis of Damper Clamp Slippage and Preventive Measures
XIA Hong-xuan;XIA De-sen
..............
page:108-109
Installation of Huaneng Yuhuan Power Plant 1 000 MW USC Turbine
JIANG Jian-ping
..............
page:87-91
Optimization of Power Plant Air Cooling System
SHI Cheng;WANG Zhi
..............
page:84-86
Analysis of 600 MW Unit Boiler Abnormal MFT
MIAO Chang-xin;YAO Chang-qing
..............
page:81-83
Comparison of Plate Heat Exchanger and Tube Heat Exchanger of Power Plant Closed Cooling Water System and Type Selection Optimization
KUANG Zhong-he
..............
page:77-80
Boiler Side Measures in Load-shedding Test of 600 MW Coal-Fired SC Units
HUANG Wei;LI Wen-jun;XIANG Yong-lin;PENG Min
..............
page:74-76
Important Technical Innovation and Project Optimization in Waigaoqiao 2×l000 MW USC Unit Construction
ZHANG Jian-zhong;CHEN Xu-sheng
..............
page:69-73
A New Type of Anti-Bird Tower Structure
ZHU Jian-chun;LUO Zhao-hua
..............
page:66-68
Analysis of Factors Affecting Transformer Oil Electric Performances
WANG Qian;YANG Li-xin
..............
page:61-65
Full Scale Test of Transmission Tower Using Cold-Bending Profiled Steel
HAN Jun-ke;LI Zheng;YANG Feng-li;YANG Jing-bo;LI Qing-hua
..............
page:58-60
Technical Upgrade of Integrated Automatization System of Puyang 500 kV Cangjie Substation
ZHANG Guo-zhi;JIA Wei
..............
page:55-57
Application of 220 kV and 110 kV Six-Circuit Line Design
YU Chao-sheng
..............
page:50-54
Thoughts on Utilizing Helicopter in Transmission Line Construction
SHENG Da-kai;HUANG Ke-xin
..............
page:44-49
Analysis of Ground Wire Monitoring Characteristics of PEMO2000
WANG Lei
..............
page:41-43
Research on Automatic Back-up System Tuning for Auxiliary Power System of Xingren Converter Station
MENG Jian-ming;CAO Ji-feng;WANG Dian-chu;ZHANG Jie
..............
page:37-40
Control Protection System Problems Identified During Gui-Guang Double-Circuit HVDC Project System Trial and Its Solutions
YANG Jie-min;SONG Tian-qi
..............
page:33-36
Optimization and Improvement of Reactive Control for Gui-Guang Double-Circuit DC Transmission System
LUO Yuan-feng;LI Biao-jun
..............
page:29-32
Installation of Capacitor Bank in AC Filter Yard of Gaoling Back-to-Back Converter Station
WEI Hui
..............
page:25-28
Study on Noise Control Scheme for Gaoling Back-to-Back Converter Station
GAO Zhan;HU Xiao-long;LI Hua
..............
page:22-24
State-of-the-art of Seismic Disaster Research and Emergency Response of Electric Power System
XIE Qiang
..............
page:1-6
Numerical Simulation and Industrial Application of Combustion Process of Horizontal Bias Less-Oil Ignited Pulverized-coal Burner
LI Lu-ming;CHEN Li-zhe;SUN Rui;LI Bo-yuan;LI Wen-bo;GUO Ai-guo;DIAO You-fen
..............
page:7-12
Experimental Study on Large Turbine Generator Foundation Anti-seismic Performance
WANG Bao-qi;MA Hua;ZHOU Xi-yuan;DAI Ze-bing
..............
page:13-17
Study on Converter Transformer Box-In Design of Gaoling Back-to-Back Converter Station
LI Hua;GAO Zhan;WU Bi-hua
..............
page:18-21
Analysis of Existing Problems of CEMS Application in Thermal Power Plants
ZHANG Zhi-qiang;PAN Jian-wen;HAN Wen-dong
..............
page:107
Cause Analysis on Over-Limit Hydrogen Conductivity in Steam of Xiaoshan Power Plant NG Units
ZHOU Chen;TIAN Hao
..............
page:106
How to Make a Power Plant a Welcome Neighbor
Derick Dahlen;Dave Pokorney
..............
page:103-105
Discussion on the Importance of Startup Logic Diagram in Entire Power Plant Startup Trial Run
PENG Chuan-bin;ZHANG You-xin
..............
page:100-102
Generator Rotor Alignment with V94.3A Turbine
WANG Xin-de
..............
page:98-99
Selection and Arrangement of 600 MW SC Boiler Hoisting Machinery
YU Cheng-long;YANG Gang;ZHANG Peng-biao
..............
page:95-97
Application of Automatic Switching Device for Auxiliary Power Supply
YANG Jian-wu
..............
page:92-94