Home | Survey | Payment| Talks & Presentations | Job Opportunities
Journals   A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
Electric Power Construction
1000-7229
2006 Issue 11
On-line Analysis and Examination System of Power Plant and Substation's information for Power Grid Dispatching Automation
ZHANG Hui;LU Jian-gang;HUANG Kai;GU Quan;ZENG Jian-yong
..............page:74-75,81
Selection and Calculation of Key Equipment for DC System in TGP, Phase Ⅱ
ZHAN Zhi-feng;XIANG Xiao-min;RUAN Sheng-dong
..............page:69-71
Application and Analysis on Management Information System of Electric Power Engineering
LIN Xue-zhu;SHI Ying;ZHAO Yu-cui
..............page:60-62,68
Selection of Turbine Start-up Mode and Bypass System of 1000 MW Unit
WEI Yong-zhi;QIN Wen-xue
..............page:44-46
Analysis on Surround Thunder-struck of 110~500 kV Transmission Lines
ZHENG Jiang;LIN Miao
..............page:35-36,50
Characters of High Resistance Grounding in Distribution Network Neutral
PING Shao-xun;LI Chang-yi
..............page:31-34
Application of Vibration Modal Identification in Dynamic Characteristics Research of Transmission Tower and Conductor
CAO Mei-gen;XU Zhong-gen;LIU Zhi-yong;TIAN Bao-zhu
..............page:22-25,28
Analysis on Project Management of North Beijing 500 kV Substation Construction
LIU Jun;MA Zhi-wei;YANG Xiao-sen;ZHANG Jun
..............page:14-18
Installation of GIS and Quality Control at North Beijing 500 kV Substation
CHENG Jin-liang;LI Wei;CHEN Shao-bing
..............page:11-13
AC Voltage-withstand Test of GIS System at North Beijing 500 kV Substation
LIU Tie-cheng;CHENG Jin-liang;LIU Kai-le
..............page:8-10
Design Features of 500 kV Substation at North Beijing
LI Dong
..............page:4-7,10
Planning and Execution for Optimization of North Beijing 500 kV Substation
WANG Xin-kang;FAN Di-cai;GAO Qi-liang
..............page:1-3