Yunnan Water Power
1006-3951
2007 Issue 4
jian xun
..............
page:21,72,94,104
Elementary Introduction to Safety Management in Construction of Xiaowan Hydropower Project
ZHAO Hong-chang;LI Chen-hao
..............
page:112-114
Elementary Introduction to Thinking of Cost Control for Construction of Manwan- Ⅱ Hydropower Project
ZHU Xiao-tao
..............
page:109-111,114
Monitoring of Underground Chamber Excavation Blasting Vibration for Manwan - Ⅱ Hydropower Project and Its Risk Analysis
ZHAO Zao-dong;YANG Xing-guo;YIN Kun
..............
page:105-108
Application of 10kV Looped network Cubicle to a Hydropower Plant and Near-by Power Supply System
LENG Wei;FENG Zhao-yun
..............
page:101-104
Solution to Problems Occurring In GIS Voltage Withstanding Test for Baise Hydropower Plant and Its Discussion
LI Zheng
..............
page:98-100
Spiral Case Water Pressure Test and Plugging Measures for High Head Francis Turbine
WANG Chang-fu
..............
page:95-97,104
The Stability Appraisal of XI Luo Du Reservoir Left Bank Accumulation(Zone Ⅳ)
FU Hai-xin;YAN Ming
..............
page:51-54
Improved Simulated Annealing Algorithm and Its Application to Slope Stability Analysis
LIN Wan-xu;WU Yu-sheng;GAO Zhi-qin
..............
page:47-50
Study on Shape Selecting for Reinforced Concrete Bifurcation Pipe
CHEN Xue-mao;LI Chao;MA Wen-liang;LIU Dong-chang;WEN Zhong-hua
..............
page:44-46
The Model Test of Crane Girder Bolted to Rock in Underground Powerhouse in Xiaowan Hydropower Station
ZHAO Zhi-yong;DENG Jia-lin;YANG Yi-wen
..............
page:39-43
Study on State of Working Performance of a New- type Pre- stressed Gate Pier for Construction of Nuozhadu Hydropower Project
XIA Fei-fei;ZHANG Zong-liang;ZHANG Tian-gang
..............
page:33-38
Study of Using Weathered Material Mixed with Gravel for Core impervious Body of a High Dam
BAO Hua-fu;SHEN Rong;LI Shi-sheng;LIAO Jian-jun
..............
page:27-32
Inquiry into the Influencing Factors and Analytical Methods of Slope Stability
ZHANG Li;HUANG Ying;REN Lei;SUN Hong-bo
..............
page:22-26
Study of All-numerical Wound Rotor Asynchronous Motor Control Device
ZHANG Qiong;CHEN Ying-jia;FU Heng
..............
page:18-21
Summary of the Methods on Fault Diagnosis for Distribution Network
HOU Yu-cheng;SHU Hong-chun
..............
page:13-17
Parameter Identification of the Static Load Model Based on Wide - area Measurement System
LI Xu-qian;SUN Shi-yun
..............
page:9-12
Study on Power Grid Planning in the Goal Electricity Market
MA Xi-mei;WANG Jian-xing;RUAN Jie-qiong
..............
page:5-8
The Unascertained Number Modelling Method Research of Load Forecast in Electric Power Network Plan
SHU Hong-chun;CHANG Yong;ZHU Wen-tao;HAN Wu;WU Juan
..............
page:1-4,8
Cause Analysis and Remedy of Abnormal Cutting- off of Turbine Gate Operating Mechanism's Break Pin
XU Yan-sheng
..............
page:93-94
Use of Imported Bottom- up Drilling Machine for Construction of Long Inclined Shaft for Huixu Hydropower Project
YANG Ming-wei
..............
page:89-92
Application of Non- destructive Detecting Technology to Anchor Rod Quality Control for Sanbanxi Hydropower Project
WANG Shuang-an;LI Chun-lan
..............
page:86-88
Application of PLC to Aggregate Processing System in Construction of Xiaowan Hydropower Project
LI Chen-hao
..............
page:83-85,88
Application of "Wall- sticking Method" of Chemical Grouting to Three Gorges Hydropower Project
HU Yao-guang
..............
page:79-82
Crack Control Measures of Rock - Anchored Girder Concrete for Underground Powerbouse of Three Gorges Hydropower Plant
ZHANG Zhi-bin;LI Ming-xin
..............
page:77-78,82
Slip - form Concrete Mix Design for Xiaowan Hydropower Project
YUAN Mei;ZHAO Jia-sheng;CHEN Wen-hai
..............
page:73-76
Removal of Diversion Tunnel Inlet Cofferdam for Jin'anqiao Hydropower Project
LUO De-sheng;XIE Shuang;YU Zhao-he;CHEN Hai;YANG Ming-dong
..............
page:69-72
Design of Removal by Blasting of Inlet and Outlet Cofferdams of Diversion Tunnel for Ruili(Shweli) Hydropower Project
ZENG Lei;XU Yuan-ting;LI Si-jin;LIU Mei-shan
..............
page:65-68
Method of Renovating and Reinforcing Yachi Reservoir
ZHAO Shi-ming;WU Gang;WANG Shu-xue;SHAO Hua
..............
page:62-64
Design of Penstock for Buguanhe Ⅲ Hydropower Plant in Chuxiaong
MA Si-lie;LUO Ya-song
..............
page:59-61,76
Underground Powerhouse Surrounding Rock Support Design for Xiowan Hydropower Plant
DENG Jia-lin;ZHAO Zhi-yong;YANG Yi-wen
..............
page:55-58