Railway Construction Technology
1009-4539
2008 Issue 2
tie dao jian zhu ji shu gao yue
..............
page:72
Analysis on Social Assessment of Railway Projects
Yang Yidong
..............
page:68-71
Discussion on the Protection Mode of Dry-Type Reactor
Zhao Guangping
..............
page:66-68
Simulated Operation Expert System of Multi Substations
Zhao Lintao
..............
page:60-65
The Application of Reinforced Concrete Built-up Retaining Walls in Double-Track Railway Construction
Yin Jiuqing
..............
page:56-59
Bearing Capacity's Time Effectiveness of Single Prefabricated Pile Hammered into Saturated Soft Soil
Tang Xiaofeng
..............
page:53-55
The Track Laying Techniques of Switch No.5 and Minor Radius Curve Track under Traction Mode by Linear Motion Actuator
Tang Dakun
..............
page:48-52
The Structure Design and Construction Technology of Bi-Block Slab Track in High Speed Railway
Wei Hedao;Wang Senrong
..............
page:44-47,55
Construction Pre-Control,Monitoring and Measurement for Shadow-Buried Clay Solitary Stone Tunnel in Laoguanzhai
Niu Fengzhong
..............
page:40-43
Deformation Treatment for Charcoal Shale Tunnels in the West Yunnan Province
Zhang Xi
..............
page:36-39
Analysis of Scour's Influence on the Stability of Piers Based on Elastic Semi-Space Soil Model
Qu Guangxiu;Kang Jiatao;Wang Hua
..............
page:31-35
Drive Characters Analysis on Large-Span Arch Bridge's Arch Rib Installation Process in Typhoon Area
Meng Fanyi
..............
page:27-30,43
Cable Tension Measurement and Analysis of Heavy-load Larger-diameter Cables
Kong Xiangjie;Cui Laijun;Zhang Bin;Chen Qiang
..............
page:23-26
Development and Application of the Integral-Type Ballastless Track's Screw Regulator
Jiang Chuanku;Duan Ming;Shi Zhiyong
..............
page:20-22,35
Course Tuning Machine-Construction Equipment on Bi-Block Ballastless Track with Tool Tracking Method
Wei Zuoshan
..............
page:18-19
Development and Application of the Integral-Type Ballastless Track Vertical and Horizontal Framework
Jiang Chuanku;Duan Ming;Shi Zhiyong
..............
page:15-17
Ballastless Track Construction Equipment of Wuhan—Guangzhou Passenger-Dedicated Line-Vertical Framework Installation Machine,Vertical and Horizontal Framework Unpicking and Washing Machine,Sleeper Device,and Logistic Flat Car
Liu Yuxian
..............
page:11-14
Development of Ballastless Track Precision Measurement System
Wu Xianghua;Ying Lijun;Cai Jie
..............
page:7-10,26
Problems on External Water Pressure on Tunnel Lining
Wang Jianyu
..............
page:1-6