Railway Engineering
1003-1995
2008 Issue 10
Prefabrication technology of box-girder adopted in passenger-dedicated railway using movable formwork method
Li Yang
..............
page:1
Casting in situ technology of continuous box-girder by scaffolding method on Huangshi super-large bridge
Sun Kun
..............
page:5
Dynamic loading test research of track-beam system adopted in Chongqing straddled-type monorail transit
Gao Yufeng;Pu Qianhui;Xia Zhaoguang
..............
page:9
Analysis of locating accuracy for double-armed steel case cofferdam adopted in construction of Tianxingzhou bridge and its monitoring measurement
Cheng Haiqin;Lan Qiping;Deng Shaofeng
..............
page:12
Application of divisional work method to construction of Yesanhe super-large bridge
Zhang Bi;Sun Ligong
..............
page:16
Design of maintenance and reinforcement for abutment of Fudigang grade separation bridge
Yao Jindong;Zheng Dongxiong;Lu Zhewei
..............
page:19
Study on local stress analysis in connection zone of pier and girder for railway continuous rigid frame bridge
Zhou Jingku
..............
page:22
Evaluation of prestressed concrete girder bridge on certain expressway with check-test
Ma Geng;Li Zichun;Ke Zaitian
..............
page:25
Study on high-performance concrete considering shrinkage creep applied in railway box-girder
Zhong Xinhua;Lei Junqing
..............
page:28
Quality contrul over C60 high-performance concrete used in Yichang Yangtze River Bridge on Yichang-Wanzhou railway
Li Ticun;Wang Shuguo
..............
page:31
Analysis of sideslope stability nearby tunnel portal
Jiang Ling;Zou Junxian;Liu Xiaowen
..............
page:35
Construction technique of tunnels spaced at small distance apart in karst regionConstruction technique of tunnels spaced at small distance apart in karst region
Xu Yongsheng
..............
page:38
Construction technique of shield-tunnel driven thrnugh Pearl River underneath on Guangzhou metro line No.3
Du Jianhua
..............
page:41
Structural design on single-track running tunnel's segmental liner used in metro project
Li Wei
..............
page:45
Construction transport organization for inclined shaft No.13 in Wuqiaoling tunnel
Gao Hongtao
..............
page:49
Construction organization in deep-buried tunnel and construction method applied under peor-geological condition
Zou Yanqin
..............
page:51
Ground surface settlement induced by construction of metro station and analysis on buoyancy and deformation of existing tunnel
Zhou Mingjun
..............
page:54
Waterproofing design of undersea immersed tunnel
Ning Maoquan
..............
page:58
Study on optimized design of cross-section of metro large-span tunnel by mining method
Zhou Canlang;Lei Jinshan;Yang Junsheng
..............
page:62
Study on prediction method of random media concerning surface settlement induced by partial excavation in large cross-section tunnel
Zhou Yu
..............
page:66
Monitoring and analysis of blasting-induced vibration during construction of metro tunnels spaced at small distance apart
Zhu Yongquan;He Benguo
..............
page:69
Study on comprehensive survey technology for sphere-sbeped weathering granite
Li Jianqiang;Feug Tan;He Ping
..............
page:73
Application of water-resistant type composite soil-nail wall to support of foundation pit
Yu Jianming;Feng Cuihong
..............
page:76
Study on treatment of soft subsoil by vacuum preloading with superimposed loading
Zhaag Keyu;Li Hongfeng;Zhang Lingnuo
..............
page:79
Practical example on treatment of quality accident in construction of pile with man-excavated shaft
Zhu Kui;Xu Riqing;Zhou Pengfei
..............
page:81
Dynamic test study on subgrade bed in turnout area of ballaatless track on Suining-Chongqing railway
Wang Zhimeng;Jiung Guanlu;Li Huaming
..............
page:84
Application of cement churning pile to strengthening soft subsoil in Tianjin coastal region
Wang Shudong;Lou Guochong
..............
page:88
jian bian gao xiao de qiao liang jie gou jia gu fang fa
..............
page:126
Analysis high-performance concrete including fined sand by using compact and stacked model
Huang Xuquan;Cheng Li;Wang Xiaoping
..............
page:122
Calculation of two-way eccentric compression member-concrete filled steel tube with square empty hole in center
Huang Hong;Zhan Bing;Zhang Ange
..............
page:120
Study on calculation method of punch capacity of prestressed concrete slab without cohesion between steel bar and concrete
Wang Feng;Bai Haifeng
..............
page:117
Quality control over commercial concrete
Liu Jianhua
..............
page:115
Finite element analysis on crossover of continuous welded turnout
Zhnng Shijie;Wang Ping;Cao Bao
..............
page:110
Analysis of track lining principles of D09-32 type continuous tamping coach
Jiang Gang
..............
page:107
Mechanical analysis on replacing of supporting block system for CWR(Continuous Welded Rail)of elastic-supporting block-type ballastless track
Lin Hongsong;Zhan Pingrui;Liu Xueyi
..............
page:104
Building of maintenance and protection system of speed up heavy haul railway
Hu Shaohai
..............
page:101
Analysis of rail damage in cage of turnover traffic growing year on year on Datong-Qinhuangdao railway and its measures
Wang Jinhu
..............
page:98
Analysis of problems in 75 km/m rail-welding using QPCJ(Quick Preheating Crucible Jettable) thermit and its prevention measures
Li Chunhua
..............
page:96
Study on type-selection of ballastless structure used in Harbin-Dalian passenger-dedicated railway
Yang Jingdong
..............
page:92
Exploring on protection method of silt embankment's sideslope and drainage measures of shoulder
Feng Jinying;Wang Bingyong;Zhong Liang
..............
page:90