Experimental study on stress ratio of pile to subsoil in composite foundation by using CFG (Cement-Flyash-Gravel) piles
Qiao Jingsheng;Xue Yunyun;Xu Guangyao
..............
page:84-85
Inspection test and analysis of axial force in steel brace during construction of foundation pit in running tunnel section adjacent to Shenyang metro's Liming (daybreak) cultural club station
Wang Xuejun
..............
page:86-88
Evaluation model based on rough collection used for introducing technical project related to passenger-dedicated railway line
Liu Yanhong;Zhang Yongping
..............
page:89-93
Construction of ballast-changing by huge maintenance coach at night on Tianjin-Pukou railway line
Wang Yanwen
..............
page:93-94
Construction technique of graded crushed stone on surface layer of subgrade bed to accommodate to speed-increasing up to 200 km/h on upgraded railway line
Liu Linjie;Li Xiangguo;Wei Yunsheng
..............
page:95-96
Exploring on construction measures for rail-connection in curved section of CWR (Continuous Welded Rail)
Wu Wenguang
..............
page:97-99
Monitoring measurement over expressway tunnel construction and its stability analysis
wang fu ming ; liu dong kun ; li xiao long ; zhang xiao wang
..............
page:49-51
Design of electricity tunnel excavated in urban water-rich sandy gravel stratum by NATM (New Austrian Tunnelling Method)
xiao zhong ping ; he chuan ; zuo qi xiang ; li zu wei ; wang yang
..............
page:46-48
Construction technique of tunnel-group of Xuanwumen metro station and analysis of ground subsidence
Bai Jijun
..............
page:42-45
Study on free vibration characteristics and structural parameters of steel tied arch bridge on passenger-dedicated railway line
Liu Dejun;Li Xiaozhen;Si Xiuyong
..............
page:1-3
Stability analysis of tied arch bridge with steel box-shaped arch-ribs
chen jian rong ; zhang jie ; wang ji ying ; xu peng
..............
page:4-5
Study on fatigue life of suspender for Lhasa Liuwu giant bridge
chen bing ; zhao lei ; yang hong ; zhou jian bo
..............
page:6-8
Study on applicable condition for single-deck 64-type railway military beams under existing railway moving load
zhang yan ping ; yi hong jian ; li hai chao ; xia ling hui
..............
page:9-11
Calculation of forces in anchor-cable during free cantilever erection of large-span arch bridge
Wang Wei
..............
page:11-13
Construction technique of main cables for Liuzhou Sanmenjiang River cable-stayed bridge
he xian jun ; hu yong ; ding jing ; chen jun wen
..............
page:14-15
Energy method used for stress calculation in unbonded bar prestressed concrete structure
Gao Yueting;Hu Yajun
..............
page:16-18
Overview on measuring method of forces in main cable of cable-stayed bridge
Liu Zhiyong
..............
page:18-20
Analysis on causes of crack in certain box-shaped structure and its remedy measures
Zhang Wei;Yan Guiping;Lin Yu
..............
page:21-23
Experimental study on deterioration load of prestressed concrete hollow slab on old bridge
Li Hongzhi
..............
page:24-25
Static and dynamic tests for study on completed Lishi cable-styed bridge with low pylon
Yao Huifa;Wang Junwen;Zhang Yunbo
..............
page:26-29
Control over temperature in concrete of casting in situ box-girder with movable form and scaffolding
Wang Bo
..............
page:29-31
Finite element analysis and experimental study on shear-bearing capacity in high-strength concrete compression-flexure member with taking account of longitudinal reinforcement's effect
Zhao Jing;Meng Lijun;Cao Lihui
..............
page:32-34
Design about girder-changing on Beijing-Qinhuangdao railway No 2 bridge under Beijing eastern-Third-Ring main road
Li Yanjun
..............
page:35-37
Numerical simulation analysis on stress in surrounding rock of cavern with complex cross-section
liu jing ru ; wu shu ren ; zhang yong shuang ; li yong hui
..............
page:38-41
Causes of track defects detected by track inspection coach using horizontal acceleration records and its treating countermeasures
Zheng Xiaolong
..............
page:99-100
Calculating analysis and discussion on subsidence in treated subsoil for large-cross-section tunnel in loess
guo jun ; wang ming nian ; li ning ; luo lu sen
..............
page:81-83
Construction technology and quality control of CFG pile in test section of Beijing-Tianjin inter-city transit traffic project
Liu Xinfu
..............
page:79-81
Design and construction of support system used in foundation pit
Jiang Xuejie
..............
page:77-78
Some problems concerning inspection of compression strength of cement-soil in jet-rotating pile using core-drilling method
Tian Hongtu
..............
page:75-76
Application of nuclear-ray method to quality-inspecting test for lime-improved soil of railway subgrade
Li Dinghua;Wang Mian;Wei Mingxue
..............
page:73-74
Analysis of underground water-induced chimecal solution effect on sideslope
Zhong Shengjun;Wang Hua;Zhao Zhiming
..............
page:70-72
Construction technique of high subgrade with filling material of soft soil
Yang Qinlin
..............
page:68-69
Application of compact-expanded stone piles to consolidation of liquefiable sany soil under expressway in Tangshan seaboard
xu zuo zuo ; sun zhong qiang ; liu ya chang ; su guang jun
..............
page:66-67
Construction technique on reinforcing of subgrade's sideslope on passenger-dedicated railway line by using double-way geotechnical lattice
Zhao Jiaming
..............
page:63-65
Selection and application of mix proportion of concrete used for tunnel lining
Li Xueyong
..............
page:60-62
Construction technique of reinforcing big karst cavern in railway tunnel by grouting
Song Xinjie;Gao Qiang
..............
page:57-59
Controlled blasting technique used in highway large-span soft-rock tunnel
Shen Hongyu
..............
page:55-56
Application of vibration-reducing method to tunnel blasting construction
Zhou Qiaoyong;Shang Yanliang;Zhao Yu
..............
page:52-54
Technique on maintenance and repair of track irregularity in long wave-length on speed-increasing up t0 200 km/h railway line
Li Guanglin;Zhang Xinkui;Zhu Limin
..............
page:101-102
Causes of instability in pressure of hydraulic system for 08-32 type tamping coach and its resolving approach
Li Zengqiang
..............
page:103-104
Exploring on implementation of regime featuring "separating into check and maintenance" for equipments managed by maintenance department
Liu Jinren
..............
page:105-106
Analysis on causes of carriage swing at zone laying of 1/12-size turnout in line with 60 kg/m rail
Zhang Yijun
..............
page:106-107
ANSYS simulation analysis of deficient in displacement of No 18 turnout with movable frog
Jing Guoqing;Li Chenghui
..............
page:108-110
Dynamic management of measuring of engineering quantities in expressway project
Liu Yuanlie;Li Fang;Zheng Erpu
..............
page:110-111
yu ying li gang jin de duo zhong fang hu yu fang hu fen ji
meng qing ling
..............
page:37,45
zi xun
..............