Home
|
Survey
|
Payment
|
Talks & Presentations
|
Job Opportunities
Journals
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
Railway Engineering
1003-1995
2005 Issue 12
Construction technique of pavement using emulsified asphalt grout
Zhang Shiping
..............
page:79-80
Total contents in classification for《Railway Engineering》in year 2005
Bai Minhua;Wang Hong
..............
page:总目次1-总目次5
Technical requirements on welding connection of CWT( Continuous Welding Turnout)
Lu Yaorong
..............
page:77-78
Stability analysis of steel frame structure of rainproof shed on platform
Zhang Xiaorong;Xiang Xiugui;Jiang Lanchao
..............
page:75-77
Control of quality of new Ⅱ -type durable concrete sleeper
Li Zhonglong;Jing Tingyin
..............
page:72-74
Construction and maintenance of laying frozen CWR on curve with minimal radius
Lin Jianji
..............
page:69-71
Selection of design schemes of placing CWR( Continuous Welding rail) on Taihe Gan River ultra-long bridge
Ma Zhanguo;Huang Bo
..............
page:66-69
Discussion on acceptance examination criteria of geometrical dimension for ballastlles track of newly constructed passenger dedicated railway line
Wang Feng;Zeng Shugu
..............
page:62-65
Automatic control and technology optimizing of temperature in steam curing of concrete sleeper
Zhou Zhaochun
..............
page:60-62
Study on dynamic inspecting measuring criteria of rail measuring coach specialized for 1-metre-guage
Zhang Wei
..............
page:57-59
Research and application of "Conversion length" used in railway maintenance and repair as well as equipment management
Chen Zhixin
..............
page:54-56
Calculation of stress in supplemental cables for landslide treatment in beach land of Three-Gorges of Yangtze River
Cui Jian
..............
page:52-53
Treatment technique of subgrade defects in spring thaw season
Liu Weiping;Sun Guojun
..............
page:50-51
Finit element analysis of box-shaped structure obliquely across railway line in construction of metro tunnel under it through
Hai Chao;Zhu Eryu;Xu Qing
..............
page:27-29
Construction method on sinking of double-walled steel cofferdam from platform on water for casting deep-water foundation
Li Xianfeng
..............
page:24-26
Analysis on design of lateral bracing of rail-girder
zhang jian jun ; zhu er yu ; hai chao ; liu bin
..............
page:22-24
Study on measurement method of vibration modes in concret beam model
Liu Lingjia;Zhao Xiaoxing;Miu Wei
..............
page:19-21
Calculation of bridge span by backwater balancing method in condition of building multiple bridges on a river
Huang Meilan
..............
page:17-18
Vacuum-injecting technology for grouting through grout-hole in 32 m-span post-tensioning girder applied on Qinghai-Tibet Railway
Xu Zhanguo;Wen Jiangtao
..............
page:15-16
Construction method of pile-hole by manual excavation in cray deposite
Dong Yuming;Liu Dongyue
..............
page:13-14
Countermeasures on controlling fissure occurred in bulky concrete
wang jun ;wang jun
..............
page:11-12
Construction technique of 50 m-span T-shaped girder used in Haoyang River Bridge
Zeng Min;Li Jun
..............
page:9-10
Side-line controlled blasting technique of rock-layer protection method with large-diametre embedded piles
Zhang Wenhui
..............
page:7-8
Inspecting calculation of forces in eroded prestressed concret girder bridge and its test proving
Liu Chun;Zhu Eryu;Zhn Xiaowei
..............
page:1-3
Research on construction technique of self-anchored suspension bridge
Chen Chunhua
..............
page:4-6
Present and future of supporting structure in deep foundation pit engineering
He Ruixia
..............
page:47-49
Application of wave velocity measurement method in railway subgrade
Zhao Hongyong;Lü Binlin;Zhu Zhonglin
..............
page:45-46
Research on ventilation technique in construction of Longtan ultra-long tunnel
Liu Jin;Fang Yuan
..............
page:43-44
Research and application of anti-water leaking and erosion-resisting concrete used in tunnel through gas strata
Liang Jianxin;Cheng Jianping
..............
page:40-42
Construction technique in large-deformed surrounding rock section of Wushaoling ultra-long tunnel
Chai Ruifeng;Wang Caigao
..............
page:38-39
Protection and treatment of cave in behind working face during driving tunnel
Zhang Jian
..............
page:36-37
Analysis of accident occurred in driving tunnel through saturated silty-fine sand by EPBS(Earth Pressure Balanced Shield)
Li Shuguang;Fang Ligang
..............
page:33-35
Stability analysis on empty area resulted from underground exploitation under Baishudi railway tunnel
Wang Shaobin
..............
page:30-32