Home
|
Survey
|
Payment
|
Talks & Presentations
|
Job Opportunities
Journals
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
Railway Standard Design
1004-2954
2008 Issue 10
Structural Design on Underground Entrance Hall of Newly Built Tianjin Station
Hu Liping
..............
page:109-113
Exploration and Practice of Some Items in Current "Code for Railway Engineering Design and Fire Protection" (TB10063-2007)
Sun Xuexia
..............
page:113-114
Design on Dynamic Lightening System Scheme for Beijing Subway #6 Line
Lu Xiaojing
..............
page:115-118
Design on Buildings in Transformation and Enlargement Engineering of Beijing-Tianjin Intercity EMUs Running into Tanggu Station at Binhai New District
Wang Yang
..............
page:105-108
Design on Wulanhaote Railway Station
Zhang Zhenyi
..............
page:103-105
Discussion on Treatment for Diseases of Existing Tunnels in Railway Electrified Transformation Engineering
zhou liu gang ; zhu an long
..............
page:98-102
Application of FLAC3D in Analysis of Ground Settlement Caused by Engineering Water Subsidence
li yong ; wang wen xi
..............
page:68-70
Experimental Research on Excavation Model of Concrete Shielding in Tunnels with Super Large Diameter Crossing River
Guo Xinjun
..............
page:71-75
Application of CRD and Double Side Wall Working Method in Construction of Collapsible Loess Tunnel with Large Cross Section in Railway Passenger Dedicated Lines
Dong Xiaobo
..............
page:75-77
Construction Technique of Seven Step Bench Cut Method for Zhangmao Tunnel in Zhengzhou-Xi'an Passenger Dedicated Line
Gong Bing
..............
page:78-81
Construction Design on Ⅲ-Class Special Surrounding Rock of Gonghe Tunnel
Nian Peihong
..............
page:81-87
Technique for Excavation Supporting Construction of Bajiashan Tunnel in Wuhan-Guangzhou Passenger Dedicated Line
Gao Hongtao
..............
page:87-90
Analysis on Disease Causation of Tunnels at Cross-Shaped Crossing as Well as Its Treatment
Yang Rong
..............
page:91-95
Treatment for Diseases of Laoyeling Tunnel in Baoji-Zhongwei Railway
deng guo zhen ; wang chao ; fu guo cai
..............
page:96-98
Scheme on Concentrated Control of Gantry Cranes for One-Hundred Steel Track Welded Base
Zhou Mingxiang
..............
page:118-119
Construction Theory on Double Block Ballastless Composite Bent Track Laying Method as Well as Engineering Practice
Zhao Dongtian
..............
page:1-5,11
A Study on Calculative Method for Temperature Stress of Continuous Track Bed Slab
zhao ping rui ; liu xue yi
..............
page:6-8
Technique of Quality Control for Treatment of Soft Foundation at Rolling Stock Depot for Guangzhou Subway #3 Line and Comprehensive Base
wang chao zuo ; xu guang min
..............
page:9-11
A Study on Connection Turnouts in Track on Yantai-Dalian Ferry Bridge
Yao Liping
..............
page:12-15
Applicable Research on Numeric Simulation in Effect Evaluation of Design Scheme on High Side Slope
Yang Mingyu
..............
page:15-17
Designing Method of Anti-Earthquake for Japanese Railway Bridges
huang jian ; sheng li ming
..............
page:18-22
Technology for Erecting Arch Ring and Suspension Cable of Inclined Tied Arch Bridge without Push
pan shou dong ; hu wei
..............
page:23-27
Design and Construction of Line Reinforcement Engineering for Cast-in-situ Frame Bridge in Existing Railway Lines
Zhang Qingsong
..............
page:28-30
Technology for Construction of Bridge Durable Concrete under Condition of Severe Coldness and Large Difference in Temperature
Chen Peng
..............
page:30-34
Space Limited Element Analysis and Calculation for Huaxi #I Bridge in Expressway around Guiyang City
liu rong ; liu chun
..............
page:35-38
Construction Technology for Rotary Drilling Cast-in-place Piles of Super Large Bridge over General Canal for Yellow River
Du Wenju
..............
page:38-41
Analysis and Calculation of 3×22.5 m Compromise Continuous Beams
Ma Haitao
..............
page:42-43
A Study on Base Design for Table Foundation of Beam Manufacture Yard for Passenger Dedicated Lines
wang guo xin ; xiao xu wen ; ao chang jiang
..............
page:44-45
Construction Technology for Bored Piles at Karst Area along Passenger Dedicated Lines
sun ai jun ; zhao ying shuang
..............
page:46-48
Tests and Load Experiment on Property of Old Bridge Materials in Lost Materials
shi zhi wei ; liu zuo ; song yu min
..............
page:49-52
Discussion on Minimum Adaptable Radius of Railway General Concrete Simply Supported T-Shaped Beams
Ling Xiaqing
..............
page:53-55
Jack-in Construction Technology for Space Curved Continuous Steel Box Beams
Li Jingzhe
..............
page:55-58
Development of Longitudinal Cast-in-situ Box Beam Formwork in Passenger Dedicated Lines as Well as Its Engineering Application
liu zhi jun ; wang xiang jun
..............
page:58-61
Technique for Quality Control of Long and Large Pile Foundation with Revolving Boring Machine to Construct Jiang'an Super Large Bridge
Wang Jianjun
..............
page:61-64
Analysis on Property of Construction Dynamics with Bench Cut Method for Soft Rock and Large Span Tunnels as Well as Its Application
Yi Guohua
..............
page:65-67