Home
|
Survey
|
Payment
|
Talks & Presentations
|
Job Opportunities
Journals
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
Railway Standard Design
1004-2954
2006 Issue 6
The Construction Technology of Swing of the Major Part in the Super Large Bridge across Suzhou, Jiaxing and Hangzhou
wang jian bin ; zhang wei ; zhao xing
..............
page:54-56
Design on the Settled Tunnel of Linhai Road in Dongjingwan
Xiao Songhong
..............
page:57-59
Analysis on the Subsidence Causation and Disposal Measures of the Tunnel during Xuanwu-Gulou Section in Nanjing Subway
qiu shi xiong ; zhang hui dong ; ma zuo
..............
page:59-60
Application of the Shield Method in Construction of Tianjin Subway
du zhi tian ; li ying ; hu hao
..............
page:61-63
The Construction Technology of the Heavy Weathering Conglomerate Tunnel
Zhang Junxing
..............
page:64-66
Design of the Vertical Shaft in Jiahuoyan Supper Long Highway Tunnel and Exploration for the Construction Method
Li Wenjun
..............
page:66-68
Exploration for the Designing Concept and Construction Measures on Preventing Drainage of the Constructive Structures in Railway Tunnels
Yin Huailian;Zhang Minqing
..............
page:69-71
Monitoring on the Secondary Lining of Xiaojiawan Tunnel's Karst and Underground River
Wang Dexin
..............
page:72-74
Analysis on the Lining Stress in the Underground Karst River Section of Wulong Tunnel
su hui feng ; liu yong ; xi jian
..............
page:74-76
The Construction Technology of Lining with a Large Cross Section in Dahewan Tunnel
Xu Xingguo
..............
page:77-78
The Construction Technology of the Railway below the Jack-in Frame Bridge in Baodong Highway
li yun shan ; wang hui dong ; zhang xiao jiang
..............
page:79-80
To Construct the Double-Line Soft Rock Tunnels below the Existing Railway Subgrade with the Method of CRD
Wu Haiguang
..............
page:81-84
Exploration for the New Technology of Substituting the Old Girders with the New Ones in the Frame Bridge of the Existing Railway
Zhang Dahu;Yu Jiang
..............
page:84-85,99
The Interior Test Study on the Thermal Insulation Material of Water Supply and Drainage Pipes in the Qinghai-Tibet Railway
Li Jian
..............
page:86-87
Exploration for the Post-Treatment of Wastewater Contaminated by Oil Spill from Railway Installations Using Biological Technology
Huang Dun
..............
page:88-89
Application of the Alternative Single Oxide Ditch in the Treatment of Wastewater at the Medium-or Small-Sized Railway Stations
Xue Linhai;Zhai Jihong
..............
page:90-92
Design on Lifting Systems of Ship-to-Shore Bridges in the Rail-Ferry Line at the Qiongzhou Strait
Mu Jun
..............
page:92-96
The Feasibility of the Maintenance Mode of Hong Kong Subway in the Application of Designing the Rolling Stock Base of Beijing Subway #4 Line
Liu Yaning
..............
page:97-99
Design of the Automation Elevator and Lift in the First Stage of Shenzhen Subway
Gao Shijie
..............
page:100-102
System Option Is the Key-Point in Structural Designing of Railway Stations
Weng Bishi;Mei Yukun
..............
page:103-105
Introduction to the Designing Scheme of Yantai Railway Terminal
Yang Hongshi
..............
page:105-107
Design of Heating System for the Buildings at Some Residential Community in Tianjin City
Zhao Shubin
..............
page:108-109
Application of the Variable-Frequency Water Supply Facility in the Transformation of Water Supply System in High-Level Residential Buildings
Wang Changjun
..............
page:110-111
A Study on Application of the Virtual Balise in Railway Train Control System
Deng Weisheng
..............
page:112-114
Analysis on the Function of the Electrified Railway Substation
Zhang Xingzhao
..............
page:115-117
The Construction of the Continuous Rigid Frame with a Large Span at the High Pier in the Major Part of Hanjiadian #1 Super Large Bridge
Li Pei'an
..............
page:40-42
Optimization of Constructing, Organizing and Designing the 2-2×80 m Steel Truss Girder in Dongyanggou #4 Super Large Bridge in the Nanning-Kunming Railway
Yu Yanshou;Li Wenjing
..............
page:43-45
Design on the Undergo Box Bridge at the Throat Section of the Existing Large Scale Station and Yard
Liu Yinghong
..............
page:45-47
The Construction Technology for the Cast-in-Site Bored Pile of the Main Pier in the Cable-Stayed Bridge over the Main Navigation Channel of Donghai Bridge
Du Jiajun
..............
page:48-49
Design of the Cable Suspended Wagon Used in Cable Stayed Bridge of Cang'an Road
Li Yanqiang;Wang Daobin
..............
page:50-51
The Construction Technology of the Post-Tensioned Prestressing Concrete Top Beam in Dongyuan Elevated Bridge
Xue Dewen
..............
page:52-54
The Quality Control for Forming Hole of the Large Diameter Deep-Depth Cast-in-Site Piles in Kaifeng Huanghe Bridge
Wang Hui
..............
page:37-39
The Construction Technology of the Bridge Pile Foundation in Karst Ground
Su Xuebo
..............
page:35-37
The Construction Technology of the Moveable Formwork with a Large Span in Nanchang Shengmi Bridge
Xu Jun
..............
page:32-34
Exploration and Research on the New Structure of the Reinforced Concrete Prestressed Truss Beams
Cai Shaoming;Rao Shaochen
..............
page:30-32
Design of the Railway Skewed Continuous Girder Bridge
Du Shijie
..............
page:27-29
A Study on the Dynamic Performance of Vehicle-Bridge with the 64 m-Span Simply Supported Beam in Hezhai Weihe Super Large Bridge
jiang zhong gui ; cao zeng hua ; zhang zuo
..............
page:25-27
A Study on Designing Bridges in Railway Passenger Dedicated Lines
Li Yibing
..............
page:22-24
Application of the Deep-Depth Concrete Mixing Pile in the Treatment of Soft Ground
Yin Huagao
..............
page:20-21
The Controlled Blasting Technology of the Cuts Adjacent to the Existing Railways
Liu Weiqiang
..............
page:18-20
Application of the Composite Ground with CFG Piles at the Testing Section of Ballastless Tracks
Zhao Tianqi
..............
page:16-17
Research and Design on the #9 Movable Turnout in 60 kg/m Tracks
Wang Jing;Tian Decang
..............
page:14-16
Research and Application of the New Technique for Repairing Damages in Powdered Subgrade
Li Shenghua
..............
page:12-13
Design on the Track Structure of Ship-to-Shore Bridge in Construction of Yantai-Dalian Rail-Ferry Line
Tian Decang
..............
page:10-12
Exploration for the Transformation of Small Radius Curves in Continuous Railway Lines
Wang Yong
..............
page:8-9
A Study on the Designing Standards for the Technical Transformation of the Existing Railways in Venezuela
Yin Fengtang
..............
page:4-7
Design on the #18 Single Slip Turnout Structure of the 60 kg/m Tracks in Passenger Dedicated Lines with a Speed of 250 km
Hou Aibing
..............
page:1-4