Water Power
0559-9342
2014 Issue 9
Strengthening the Construction of Project and the Operation Management to Achieve Maximum Benefit
CHU Yueting;
..............
page:1-3
Overview on Optimization Management of Tingzikou Water Control Project in Jialing River
XIONG Xiong;
..............
page:4-7,48
Corporate Safety Culture Construction Based on "4H+E" Mode
HE Yongdong;
..............
page:8-11
Planning and Implementation of Tingzikou Reservoir Resettlement
DU Guangfu;,YIN Tianming;
..............
page:12-14
Compilation and Implementation of Environmental Protection Supervision Rules in Tingzikou Water Control Project
WANG Da;,WANG Dan;
..............
page:15-16,28
Optimization of Phase-Ⅲ Diversion Program of Tingzikou Water Control Project
ZHANG Xiaochun;
..............
page:17-19,31
Construction Technology Improvements on Water Sealing and Drainage System of Dam Transverse Joints
ZOU Jinbo;
..............
page:20-21,57
Stability Analysis and Treatment of Dayuanbao Landslide in Tingzikou Water Control Project
LIN Xiangyang;
..............
page:22-25
Analysis of Temperature Stress and Control Measures of Tingzikou RCC Gravity Dam
LI Yue;
..............
page:26-28
Tests on Shear Strength of Dam Normal Concrete Key Trench
CAI Shenghua;,CHEN Wenzhuo;,XIE Mengliang;
..............
page:29-31
Construction Design Optimization of Tingzikou Water Control Project
LIAO Yuanzhi;,LIN Xuefeng;,SHAO Nian;
..............
page:32-34,83
Research and Application of Fair-faced Concrete Construction Technology for the Powerhouse of Tingzikou Hydropower Station
DU Jinqin;,LI Chunfeng;,WANG Kesheng;
..............
page:35-37,74
Curtain Grouting Technologies for the Red Layer Foundation Rock in Tingzikou Water Control Project
ZHOU Xiaojun;
..............
page:38-40
Application of Controlled Blasting in the Construction of Navigation Engineering of Tingzikou Water Control Project
LI Bo;
..............
page:41-43
Process Control on Ship Chamber Concrete Backfilling Supervision of Tingzikou Water Control Project
GU Song;,ZHAO Xianwei;
..............
page:44-46
Quality Control of Spiral Case Backfilling and Contact Grouting in Tingzikou Water Control Project
XIE Mengliang;
..............
page:47-48
Review on Quality Control of Roller Compacted Concrete with Natural Aggregate
WU Zhengmin;
..............
page:49-51,54
Turn-over Formwork Construction for Overflow Surface of Surface Spillway in Tingzikou Water Control Project
XIONG Pan;
..............
page:52-54
Characteristics of 500 kV Transmission Line and Its Protection of Tingzikou Hydropower Station
LING Hongzheng;
..............
page:55-57
Determination of Installation Elevation for the Fixed and Rotating Parts of Turbine-generator in Tingzikou Hydropower Station
XIONG Zhongbo;
..............
page:58-59
Study and Treatment of Grounding Grid Measuring of Tingzikou Water Control Project
HAN Manguo;,SU Biao;
..............
page:60-62,66
Testing and Analysis of Primary Frequency Regulation of Turbine-generators in Tingzikou Hydropower Station
QIN Lilin;
..............
page:63-66
Structural Characteristics of Thrust Bearing with Multiple Distribution Coil Springs in Tingzikou Hydropiwer Station
HE Danxin;
..............
page:67-68,80
Transformation and Optimization of Governor System for the Generating Units in Tingzikou Hydropower Station
FENG Lei;
..............
page:69-70,87
Computer Supervise and Control System Design and Equipment Configuration of Tingzikou Hydropower Station
LING Hongzheng;
..............
page:71-74
Application of Pulse-echo Method in Void Detection of Spiral Case of Hydropower Station
JIANG Yulong;,XIONG Zhongbo;
..............
page:75-77,87
Foundation Pit Deformation Monitoring and Analysis of Tingzikou Water Control Project
WANG Zhiyong;
..............
page:78-80
Application of Infrared Diagnosis Technology in Tingzikou Water Control Project
LI Pan;
..............
page:81-83
Safety Monitoring and Management of Dayuanbao Landslide in Tingzikou Water Control Project
SHI Jie;
..............
page:84-87
Generator Air Gap Monitoring Technologies and Its Application in Tingzikou Water Control Project
LUO Anquan;
..............
page:88-90