Water Power
0559-9342
2006 Issue 9
The Analysis of Surface Water Resources in a Reach of a River in Dry Year
Hou Wenping
..............
page:18-19,53
Research on the UML Frame Model of Hydropower Cascade Exploitation Immigrates the Evaluation Index System
Wei Qingping;Zhang Qiuwen
..............
page:13-17
Policy and Management System of Land Acquisition & Resettlement Induced by South-to-North Water Diversion Project
Wang Baoen;You Guowen;Zhu Dongkai
..............
page:9-12,17
Discussion on Operating Patterns of Shenzhen Pumped-Storage Power Station
Wang Chunhui
..............
page:6-8,60
Exploring Project-based Organizational Structure Changes of Hydropower Development Companies for Multi-project
Yang Bo;Qiang Maoshan
..............
page:1-5
Demolition Scheme and Implementation of the Third Stage Upstream RCC Cofferdam for Three Gorges Project
Huang Aiguo
..............
page:20-24
Influence of Construction and Impounding Process on the Stress of Super High Arch Dam
Ge Shaoqing;Zhang Guoxin;Yu Jianqing
..............
page:25-27
Construction Technics and Quality Control of Plastic Concrete Cut-off Wall of Sanmenxia Huaiba Reservoir
Cao Hongliang;Zhang Peng;Li Qingfu
..............
page:28-30,70
Spray Technology of Polyurea Elastomer and Its Application in Nierji Projects
Sun Zhiheng;Guan Yushi;Bao Zhiqiang;Wang Chen;Feng Shiquan
..............
page:31-33
Reinforcement Tests on the Mucky-soil Foundation of the Rockfill Dam for Renzonghai Hydropower Station
Song Hongying;Li Xiaoli
..............
page:34-36
The Structure and Operation Characteristics of Francis Turbine with High Rated Head
Zeng Zhenling
..............
page:37-39
Design of Speed Governor Testing System based on TMS320LF2407 DSP Chip
He Xiuru;Chen Rongzhou;Guo Zhijun
..............
page:40-41
Design and Development of Supervision and Control System of Hydraulic Gate base on iFIX3.5 Configuration Software
Wang Shudong;Bian Dangwei;Bian Yuguo
..............
page:42-44
Study and Practice of Construction Technique of Longtan Dam under the Condition of High Temperature
Dai Bo;Cheng Gangwei
..............
page:45-47
Accurate Understand the "Smooth Outside with Compacted Inside" of Hydraulic Concrete
Pan Luosheng
..............
page:48-49
Temperature Control Measures for RCC Construction of Longtan Dam under Hot Season
Ning Zhong;Li Yi
..............
page:50-53
Fast Construction Technique of RCC Gravity Dam for Longtan Hydropower Station
Wu Xu
..............
page:54-56
Excavation and Timbering about the Underground Generating System by Piloting Water of Longtan Hydropower Station
Huang Gang;Yang Tianji;Dong Fajun
..............
page:57-60
Technical Indexes and Mix Proportion Design of the RCC for Longtan Hydropower Station
Cai Suchuan;Yang Huai;Ren Rong
..............
page:61-63
Discussions on RCC Initial-set Time Measurement method
Wang Shuyin;Li Jiajian
..............
page:64-67
Design and Construction of RCC Cofferdam for Longtan Hydropower Station
Qing Duxing;Song Yinong;Zhou Jie
..............
page:68-70
Determination of Cooling Ways of Hydro-generator for Longtan Hydropower Station
Yang Zhenxian
..............
page:71-73
Welding in Construction Site and Static Balance Tests of the Runner of No.1 Turbine of Longtan Hydropower Station
Xu Gang;Shen Caishan;He Fan
..............
page:74-75,94
Development and Application of New Working-face Sprayer for the Dam Project of Longtan Hydropower Station
Zhu Hongqiang
..............
page:76-77,90
Land Acquisition and Resettlement Work of Longtan Hydropower Station
Jiang Jinhua
..............
page:78-80,86
Study and Application Development of Interior Energy Dissipator in Hydraulic Tunnel
Zheng Linping;Li Yuejun
..............
page:81-83
The Computer Program of Calculating Internal Force of Elastic Foundation Beam based on Guo look-up table method
Huo Hongli;Shi Kebin;Zhang Sheng
..............
page:84-86
Virtual Instrumental System of Real-time Safety Monitoring of Dam
Tan Delin;Li Qingbin
..............
page:87-90
Construction and Application of Water Dispatching Automatic System in Chencun Hydropower Station
Zhao Cuixiao;Zhu Xiaoshan
..............
page:91-94
Application of H9000 Computer Supervisory Control System to Beixi Hydropower Station
Ma Haitao
..............
page:95-96