Water Power
0559-9342
2005 Issue 10
Application of instrumentation and monitoring during construction in the excavation of power tunnels in Jufudu Hydropower Station
Li Song-lin;Yang Fu-ping;Qi Hong-jun
..............
page:82-83
The selection of parameters obtained from the RCC site test
Yu Wei-dong;Luo Wei-min;Chen Li-guang
..............
page:79-81
Production test of the foundation grout curtain for the double curvature dam of Dongping Hydropower Station
Sun Xiang-nan;Xue Wei;Liu Jian-xia
..............
page:77-78,81
Study on concrete temperature control for Xiaowan arched concrete dam
Shu Guang-sheng
..............
page:74-76
Overeview of the construction technology of the third stage cofferdam of Three Gorges project
Guo Guang-wen;Wang Zhang-zhong;Sha Bao-wei
..............
page:17-19
Overeview of the technology of temperature control of massive body of the third phase work in Three Gorges project
Xing De-yong;Xu San-xia
..............
page:14-16,27
Overeview of the new technology in construction of the second stage work of Three Gorges project
Zhou Hou-gui
..............
page:8-13
"Quest for Win-Win" is the wise decision for a construction enterprise
Ren Sheng-chun
..............
page:5-7
Speeding up development making steady advancement building a harmonic "grand wealthy" Gezhouba group
Yang Ji-xue
..............
page:1-4
The study on controlled blasting in excavation of diversion runnels of the underground power plant on the right bank of Three Gorges project
Dai Zhi-qing;Zhang Kai-guang
..............
page:71-73
The manufacture method for the steel pipe arch of Huangbo River bridge of the Three Gorges project
Peng Jing-liang;Li Li-li;Chen Ai-guo
..............
page:69-70
Analysis and treatment of problems in the erection of the 700 MW-generating unit in the Three Gorges project
Jiang Xiao-bing;Zhou Hui
..............
page:66-68
Measures against cracking on the massive concrete blocks by temperature control at the Dongping Hydropower Station
Xue Wei;Lǖ Zhi-lin;Zang Wen-ke
..............
page:64-65,68
Rock powders are used as admixture to the natural sands for roller compacted concrete of Jinghong hydroelectric project
Wen Jie;Fang Dun-yu;Zhou Shan
..............
page:61-63
Construction technology of the more cold and much rain roller compacted asphalt concrete core wall
Ma Jia-yan;He Kai-ming;Zhu Zhi-jian
..............
page:58-60
Design of the cooling system for the concrete production at EL360m of the Longtan project
Huang Yuan-hua;Zhang Shao-bin;Feng Xiao-yong
..............
page:55-57
Construction and inspection of side confronted compacted concrete side walls of Shuibuya concrete faced rock fill dam
Huang Xian-hua;Zhao Chun-xiu
..............
page:53-54,76
Crushing technology of artificial gravels at Gushuling of Three Gorges project
Lan Fang
..............
page:50-52
Implementation of concrete temperature control system of the second stage works in Three Gorges project
Li Hong-qing;Zuo Feng
..............
page:48-49
The construction of grouting cut-off walls under high pressure for the Jufudu hydroelectric project
Zou En-shi;Xia Jun;Han Chong-zhi
..............
page:45-47
The forced tamping of the overburdens of gravels in the riverbed of the Shuibuya hydroelectric project
Zhang An-ping;Tan Bi-xuan
..............
page:42-44
Construction of deep to overlay for seepage control wall in the Yele Hydropower Station dam
Xiang Yong-zhong;He Kai-ming;Ma Jia-yan;Zhu Zhi-jian
..............
page:39-41
Design and construction of silt removal works by blasting on soft foundation of wave-breakers embankment
Li Wan-qun;Sun Ling-jiao;Yi Xian-chang
..............
page:36-38
Laying out of extra-long submerged pipelines
Yang Fu-ping;Yu Zhi-gang;Duan Bao-de
..............
page:34-35
Excavation of surge shaft at Jinhe hydroelectric project and supervision of construction
Xiang Hong-wei;Wen Min-an;Wang Wei
..............
page:31-33
Use of Model LT 140 portable crushers at the Dafaping quarry of Longtan project
Chen Shun-hai;Zhu Xian-shan;Wang De-yun
..............
page:28-30
Blasting technology of the Dafaping quarry site of Longtan project
Wang De-yun;Wang Wei;Liu Zhi-hua
..............
page:25-27
Construction of rock retaining sills at the river bed during river closure for the diversion channels of Three Gorges project
Xiang Hong-wei;Hu Jian-ming;Nie Zhi-feng
..............
page:23-24,47
Key technology in excavation of large size diversion tunnels on the right bank of Xiluodu Hydropower Station
Li You-hua
..............
page:20-22