Yangtze River
1001-4179
2009 Issue 10
Summary on filling construction for cofferdam of Nuozadu Hydropower Station
HUANG Zong-ying
..............
page:1-3,7
Contact grouting construction for intake steel linings on left bank of Longtan Hydropower Station
ZOU Zheng-quan;SONG Yuan-sheng
..............
page:4-5
Application of acoustic wave test in excavation of dam foundation of Nuozadu Hydropower Station
HOU Shun-li;YANG Chun-jing
..............
page:6-7
Application of pumping concrete in cushion layer construction of core wall of Nuozadu Hydropower Station
TANG Ru-min
..............
page:8-9,19
Construction technology and method of anti-seepage material exploitation for core wall of Nuozadu Hydropower Station
YE Xiao-pei
..............
page:10-11,15
Blasting demolition of cofferdams at inlet and outlet of No. 3 diversion tunnel of Nuozadu Hydropower Station
GUO Chao
..............
page:12-15
Construction technology of excavation and support for chlorite schist tunnel in high geo-stress area
LI Hong
..............
page:16-17
Design and application of overflow protection in rock and soil cofferdam of Shatuo Hydropower Station
LI Qian
..............
page:18-19
Construction of concrete extrusion side wall for CFRD of Sujiahekou Hydropower Station
WANG Gang
..............
page:20-21
Smooth blasting design of type Ⅳ surrounding rock for long and deeply embedded tunnel
MA Wen-bo
..............
page:22-23
Foundation treatment of separation levee for approach channel in downstream of Shatuo Hydropower Station
SHI Cheng-cai
..............
page:24-25
Discussion on claim for damages due to poor organization of work of Tai'an Hydropower Station
FU Yu-tang
..............
page:79-82
Discussion on biding strategies of a hydropower project and its compilation skills
JIANG Qing-yan
..............
page:77-78
Application and analysis on project management information system of construction enterprises
WANG Jun
..............
page:74-76
Layout of emergency alarm system in long and deeply embedded tunnel
FAN Xiao-zhong
..............
page:55-56
Summary on failure analysis and removal for hydraulic transmission system of vehicles
GAO Yu-guo
..............
page:53-54
Technology upgrading for control system of concrete batcher of Shatuo Hydropower Station
YOU Shu-ming
..............
page:51-52
Operation and commissioning of filter material processing system of Nuozadu Hydropower Station
CHEN Han
..............
page:48-50
Type C7050 tower crane installation for intake towers of No. 3 and No. 4 diversion tunnels of Nuozadu Hydropower Station
YANG Chun-jing
..............
page:46-47
Equipment installation of aggregate processing system of Nuozadu Hydropower Station
YAO Wen-li;MA Li-li
..............
page:44-45
Construction technology of river closure for Nuozadu Hydropower Station
HE Bo-wen
..............
page:42-43,54
Centralized management of fund for construction enterprises under network environment
WANG Jing-xia
..............
page:72-73
Analysis on management of dam construction contract of Pubugou Hydropower Station
DONG Zhao
..............
page:71,82
Discussion on protection of lawful tights of contractor through claim
LIU Ying-qi
..............
page:68-70
Key link control of operational management for hydropower projects
YU Jing
..............
page:66-67
Discussion on project cost control of Armed Police Hydropower Troops
ZHAO Xian-zhong
..............
page:65,70
Exploration on financial management for projects of Armed Police Hydropower Troops
HUANG Xiang-rong
..............
page:63-64
Promoting scientific and technologic innovation by "Four New" Science Popularization Activity
LI Hu-zhang
..............
page:62,64
GPS precise single-point positioning based on dual-frequency pseudo random code and pseudo-range and phase
CAO Wen-bo
..............
page:59-61
Collapse treatment in poor geologic section of No. 4 diversion tunnel of Jinping Ⅱ Hydropower Station
YAO Zhi-hui
..............
page:57-58
Selection of steel mould jack plane for concrete placement of diversion tunnel of a hydropower station
LI Xiang
..............
page:40-41
Application of inversed-installed slip-form in dam toe slab of Sujiabekou Hydropower Station
XIE Shen-wu
..............
page:38-39
Construction of isolated layer with emulsified asphalt at slopes of Sujiahekou CFRD
YIN Yi-ting
..............
page:36-37
Underwater blasting excavation of dam foundation of Shatuo Hydropower Station
TIAN Zhan-feng
..............
page:34-35
Application of nano concrete in support for tunnel under poor geologic condition
CHEN Dong
..............
page:32-33
Flexible slip-form construction technology for concrete placement in core wall zone of Nuozadu Hydropower Station
YAO Zi-You
..............
page:30-31
Construction technology for fault F3 of No. 3 diversion tunnel at right bank of Nuozadu Hydropower Station
ZHUO Zhan-wei
..............
page:28-29,31
Water drainage measures for up-slope construction of diversion tunnel of Jinping Ⅱ Hydropower Station
YU Bao-zhen
..............
page:26-27