The Brief Introduction on the Water Reservation Measure of the Thermal Power Plant
xue zuo ; wang zi kuan ; dong hui zuo
..............page:1-3
The Application of the Matrix Methodology for the Electric Power Network Topology
li xiao peng ; hou you hua ; liu bin ; jing zhi bin
..............page:4-5,12
The Operation and the Protection of the Power Transistor of Reverse Transmitter
wu ji guang ; bai ge ping ; yang wen li
..............page:51-53
Summary on the Synchronous Electric Power Generator under the Asynchronization
hao pei sheng ; zhang hai hong
..............page:48-50
The Retrofit to the Shaft End Gland of the Turbine Low Speed Cranking Device
zuo heng wei ; yang hua zhen ; liu yu hong
..............page:47-47
The Analysis and Treatment of the CVT Failure, Dalate-Fengzhen 500 kV Power Lines
meng wen tao ; zhang hai qing
..............page:46-46,53
The Testing for the Commercial IVS-SN Type Inserted and Vibrated Coal Sampling Device
zhang zai qin ; gai yan min ; zhao yan ; sun li qiang
..............page:35-37
The Supervision and the Evaluation to the Distance Section of the Concrete Gravity Dam
jia jun gang ; zhi yu qing ; zhang jun lao
..............page:19-21
The Disposition of the Main Electrical Equipment in Wanjiazhai Hydraulic Power Plant and its Main Feature
zhi yu qing ; lin xia ; gong chang nian ; zheng shu hua ; wang zhong ren ; zuo guo fu
..............page:10-12
The Realization of the Suppositional Formidable System with the Voltage Stabilizing Phase Modulation Motors
meng qing liang ; zhao jian zhong ; duan lan shuan
..............page:6-7,15
The DC Power System Design of 2×200 MW Units, Hohhot Power Plant
zhu zhi hai ; chang hong
..............page:32-34
The Design and the Application of the DEH System for 220 MW Unit
zhu xi yu ; wei jun heng
..............page:30-31