Home
|
Survey
|
Payment
|
Talks & Presentations
|
Job Opportunities
Journals
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
Hongshui River
1001-408X
2016 Issue 5
GIS-Based Flood Disaster Risk Assessment for Guilin City in Guangxi
MA Rongyong;,YI Yunmei;,LI Jiang;
..............
page:1-5
Prototype Closing Test in Flowing Water for Deep Emergency Gate with High Water Head
CHEN Hongwei;,YAO Hongchao;,CHEN Liye;
..............
page:6-8,16
Application of 3D Engineering Geological Design System in Hydropower Projects
GUO Yuanshi;,YAO Gaofeng;,TANG Hao;
..............
page:9-12
Technology of Rock Anchored Beam Excavation for Left-bank Main Power House of Wudongde Hydropower Station
ZHANG Jiatao;,QI Jieyi;
..............
page:13-16
Analysis of Temperature Stress on Old-new Concrete Interface of Wanjiakouzi Arch Dam
WANG Fuwan;
..............
page:17-20
Analysis and Treatment of Pump Cavitation Mechanism
LIU Junhong;,PENG Yanli;
..............
page:21-25
Technology of Continuous Rising Formwork for Complex Concrete Structural Plane of Power House of Guanyinyan Hydropower Station
LUO Yuanyao;,ZHENG Jianlin;
..............
page:26-29
Reinforcement Design for The Middle Orifice of Wanjiakouzi Arch Dam
LI Pengchong;
..............
page:30-33
Study on Construction Scheme for Water Retaining Dam of Tailing Pond of Qulong Copper Polymetallic Ore
CAO Li;,LENG Zhenhua;,TAN Yibing;
..............
page:34-37,43
Concrete Engineering of 4# and 5# Units in Power House of Guanyinyan Hydropower Station
ZHENG Jianlin;,LUO Yuanyao;
..............
page:38-43
Reinforcing Treatment of Scouring Sluice for The Second Stage Dam of Atay Hydropower Project
JIANG Yonghong;
..............
page:44-48
Comparison and Selection of Main Electrical Connection for Domestic and Foreign Medium-sized Hydropower Projects
LIU Huilin;
..............
page:49-53,64
Study on Piping and Failure of Cofferdam of A Hydropower Station
DIAO Shuguang;,DUAN Zhiyong;
..............
page:54-57
Overburden Curtain Grouting Design for Left-Bank Abutment of The Second Stage Dam of Atay Hydropower Project
LIANG Liang;,JIANG Yonghong;
..............
page:58-60
Technology of Diversion Tunnel Plugging in Tiechuanqiao Hydropower Station
OUYANG Shuiya;,ZHOU Bo;
..............
page:61-64
Study on GPR Detection of Composite Lining Thickness in Headrace Tunnel
DU Song;,WANG Fan;
..............
page:65-70,85
Analysis of Pre-stressed Pier Anchor Cable Monitoring of Bottom Outlet of Hydropower Station
HAN Rongrong;,LIAN Yuhao;
..............
page:71-73
Design of Supporting Pier and Cast-in-place Pile on Bank Side of Neijiang Trash Rack of Changzhou Hydropower Complex
YE Dan;,LAN Xiaojun;,LIU Huajun;
..............
page:74-76
Analysis of Sliding Mass Stability and Study of Engineering Treatment
HAO Peng;,ZENG Rongfu;,WANG Meng;,TANG Tengfei;
..............
page:77-81
Instability Analysis of Composite Plastic Pipe Reinforced by Winding Steel Wires (PSP) under Vacuum Condition
TANG Haipin;
..............
page:82-85
Discussion on Key Technology of Design and Construction of 70MW Fenyi Fishing-Photovoltaic Complementation Power Station
LIN Wen;
..............
page:86-89
Discussion on Economic Operation Parameter and Mode of 35kV Step-down Transformer
WANG Yazhong;,YAO Xuming;,SHAN Wanghua;
..............
page:90-93
Discussion on Guangxi Power Grid Distribution Automation Implementation in The 13th Five-Year Plan
ZHANG Chao;,WANG Hualong;,LI Hongyu;
..............
page:94-97
Study on Method of Live Replacement of Strain Insulator Strings with Super-long and Large Tonnage on Strain Tower of ±500kV Xing'an DC Transmission Line
FAN Changhai;,WU Zhengshu;,LI Changpu;,LU Wensan;
..............
page:98-102
Analysis and Demonstration on Basic Wind Speed Value of an Overhead Transmission Line in Guangxi Coastal Area Affected by Severe Typhoon Rammasun
ZHOU Changfa;,WANG Le;
..............
page:103-106
Analysis of Cable Fault of 35kV Tao-Cong Transmission Line
WU Zhengshu;,LU Yingjun;,MA Zhongyi;
..............
page:107-110
Analysis and Treatment of Loose Guide Bearing Collar on Top Shaft of Hydraulic Generator of Letan Hydropower Plant
LU Liuyan;
..............
page:111-114
Analysis and Countermeasures of Open Secondary Circuit of Current Transformer
YIN Ge;
..............
page:115-117,132
Analysis and Treatment of Overheating Fault of Enclosed Bus Joint at LV Side of Main Transformer
WEI Liudan;
..............
page:118-121
Analysis and Countermeasures of Drain Valve Failure in Flow Channel of Bailongtan Hydropower Station
CHEN Kaiping;
..............
page:122-124
Analysis and Treatment of End Shield Un-grounding Fault of 220kV Current Transformer
LIAO Yan'an;
..............
page:125-128
Problems and Suggestions on Social Stability Risk Assessment of Fixed Asset Investment Project of Guangxi
ZHAO Hulin;
..............
page:129-132
zhuan gao xu zhi
..............
page:133