Discussion on Establishment and Stability Test References for Engineering Survey and Control Network
LI Jing-jing
..............
page:113-114
Application of Two-dimensional Mathematical Model in Flood Impact Assessment in Landscape Reconstruction Project
JIN Ming-yu
..............
page:47-51
Analysis and Study on Phase-measuring Algorithm for Laser Range Finding
HUANG Ying-ying;XUE Xiao-zhan
..............
page:39-42
Application of AVC System in Guilin Grid and Its Improvement Measures
LI Wang-ming;SUN Chun-ri;LI Nai-biao
..............
page:88-92
Modification Methods for Defects on Bulb Tubular Unit in Luodong Hydropower Station
WEI Chao
..............
page:83-84,95
Selection of Commissioning and Adjusting Parameters for Governor System of Yuliang Hydropower Station
LI Zhao-sheng
..............
page:64-67,77
RCC Cofferdam Construction at Downstream of Longtan Hydropower Station
JIA Ji-feng
..............
page:23-25,34
Maintenance and Improvement of Large Kaplan Turbine Runner
AN Jin;XIONG Jian-ping
..............
page:78-82
Research on Raising Generator Voltage and Current from Zero by Using of Electric Braking Transformer and Its Application
XU Mei-qing
..............
page:43-46
Analysis and Research on Current Situation of Biomass Combustion Power Generation in Guangxi
TAN Zhen-yun
..............
page:35-38
Causes Analysis and Treatment for Over Vibration in Runner Chamber of Jinyintai Hydropower Station
WANG Ze-hong
..............
page:72-77
Application of Whole Membrane Technology in Water Treatment Design and Its Considerations
LI Cheng
..............
page:19-22
Ski-jump Energy Dissipation and Scour Protection Design for Spillway with High Head, Narrow River Channel and Large Obliquity
SUO Hui-min;WANG Fang-liang
..............
page:5-8,18
Analysis on Selections of Unit Capacity and Rated Speed for Rumei Hydropower Station
ZHAO Ming-qin
..............
page:68-71
Discussion on Implementation and Commissioning of Primary Frequency Regulation of Naji Hydro-junction
XIONG Xian-hua
..............
page:30-34
Design and Results Analysis on Dam Displacement Monitoring for Phase-Ⅱ Malutang Hydropower Station
WANG Jian-ying;HUANG De-wu
..............
page:13-18
Type Selection of Circulating Pump for Thermal Power Plant
LIAO Pei-shan
..............
page:107-112
Cofferdam Design and Improvement for Extension Project of Dahua Hydropower Station
HUANG Hai-yan
..............
page:9-12
Analysis on Impact of Pingban Damsite's Water Environment on Hydraulic Structures
SHAO Yuan
..............
page:104-106
Application and Promotion of Main-wheel Seal Improvement Technology in Ship Lock Filling and Discharge Gates of Guigang Hydro-complex
PAN Rui-sen
..............
page:85-87,98
Construction Diversion Schemes for The Third and Fourth Ship Locks of Changzhou Hydro-complex
ZHANG Hong-yong;ZOU Peng
..............
page:1-4,12
Present Situation and Prospects of Wind Power Development in Guangxi
LIU Ming-jun
..............
page:93-95
Primary Study and Suggestions on Guangxi New Energy Construction
GAN Yong-quan;LING Wu-neng
..............
page:96-98
Economic Benefit Analysis on Sandstone Aggregates Used as Asphalt Pavement Surface Layer of Zhongshan~Majiang Expressway
LIANG Sou-ling;WEI Xiang-jing;ZHOU Jian-qi
..............
page:26-29
Application and Control Optimization of Microcomputer Governor in Yantan Hydropower Station
TIAN Jing
..............
page:59-63
Discussion on EPC Management of an Overseas Hydropower Project
LIANG Xiong;LU Wu-sheng
..............
page:99-103
Gray Predication for Flood Disasters in Tongjiang River Basin
LI Jian
..............
page:56-58,63
Static and Dynamic Safety Evaluation for Powerhouse Intake Tower of A Hydropower Station
TANG Hao;XIE Ling-fei
..............
page:52-55