Hunan Electric Power
1008-0198
2009 Issue 5
Application of integrated automation system in Pengshui hydro power station
zhou fen qiang
..............
page:25-27
Application of Fast Gen generator remote detection system
cheng hai zhou
..............
page:20-21,24
Application of high chromium grinding ball in double-in-double-out pulverizing mill and its benefit analysis
bao li qun ; jiao qing feng ; xiao ke ; zhu guang ming ; chen hui ; duan xue nong
..............
page:22-24
Safety Protection Scheme for Power Plant Secondary System
gu lin ; zeng hua lin
..............
page:16-19
Analysis of main stream adjusting characteristic of 600MW opposed firing super-critical boiler
yu peng feng ; huang wei ; lei lin
..............
page:12-15
New method for HV Transmission line survey and positioning
luo jia wen
..............
page:9-11
Installation and maintenance technology for turbine high temperature fastener bolt
jiang li dong ; yi tie xiang
..............
page:56-58
Features of PQ and compensation methods of active power filter in microgrid
lei zhi li ; lu xi juan
..............
page:59-62
Construction measures for extremely cold areas in winter season
zhang guo bin
..............
page:48-50
Problems existing in 300 MW sub-critical turbine commissioning and treatment
li xu ; liu yong hui
..............
page:51-53
Fracture failure analysis of 20CrlMolVTiB turbine bolt
wang fei ; xia zun mei ; wang hong ying
..............
page:54-55,58
Cause analysis for 220 kV vertical arrangement twin bundled lines adhesion and countermeasures
yang gao guang hui
..............
page:42-44
Characteristic analysis and study on start-up of intermediate pressure cylinder in 600MW super-critical unit
zhou xue bin ; yu xiao wei ; liu yong hui
..............
page:45-47
Application of new-style regulative capacitor in series compensation AC de-icing equipment in Hunan power grid
lei hong cai ; lu jia zheng ; li bo ; zhang hong xian ; fang zhen ; jiang zheng long
..............
page:28-29,44
Application of 12-pulse fixed DC de-icing equipment in Chengqianling substation
fang zhen ; lu jia zheng ; zhang hong xian ; li bo ; jiang zheng long
..............
page:30-31,47
Statistical analysis of Hunan power grid ice-covering condition in 2008~2009 winter
zhang hong xian ; lu jia zheng ; peng ji wen ; fang zhen ; li bo ; jiang zheng long
..............
page:32-35
Lightning failure analysis of ±500 kV Jiang-Cheng HVDC transmission line
jiang zheng long ; lu jia zheng ; wang cheng ; shen zhi shu
..............
page:36-41
Impacts of operation of Heimifeng Power Plant on security and stability of Hunan power system
song jun ying ; huang liang gang
..............
page:5-8,11
Numerical calculation of substation grounding grid corrosion based on node voltage method
he zhi qiang ; zhou wei hua
..............
page:1-4,19