The Innovation and Challenge Brought by the Application of Power Electronic Technologies to Shanghai Power Grid Development
TENG Letian;HE Weiguo;LIU Jun;BAO Hailong
..............
page:1-5
Study on the Power Supply Reliability of Beijing Olympic Games' Competition Arena
XIA Quan;LI Wei;GAO Yan
..............
page:6-7,19
The Influence of Electric Railway Load on the Power Quality of Power Grid and Countermeasure
WANG Tongxun;YU Kunshan
..............
page:8-11,32
Thinking about "Earth Hour" Activity and the Relation with Power Network Operation
LIANG Lianjiu;LIU Peng;XU Guangwei;LIANG Shuang
..............
page:78-79
Discussion on the Professional Career Management of Power Supply Enterprise Staff
LI Weimin;HU Qidong
..............
page:75-77
Innovation Mechanism about the Staff Skill Training of Power Supply Enterprises
HONG Yazhu
..............
page:72-74
Strengthening the Safety Management of Power Supply and Utilization of Newly Built Petrochemical Enterprise
CHEN Weijun;ZHAO Guochang;CHENG Yunyun;AN Peng
..............
page:69-71
Meticulous Management for the Line Loss of 10 kV and Below Power Network
LI Shu;GONG Jiayi;MO Yingtao
..............
page:65-68,77
Data Determination for the Design of Fire Protection Compartment and Ventilation Area of Urban Power Cable Tunnel
ZHAO Hui
..............
page:63-64,71
Transmission and Processing of On-line Monitoring Data for Power Cable
YAN Xinhua;ZHOU Xiongming
..............
page:60-62
The Integration of Distribution Automation System and Geography Information System
WU Ruying;ZHU Yiyong
..............
page:33-35
Upgrade and Reformation of the Dispatching Automation System of Dalian Power Network
YU Peng;PAN Pengfei;YAO Deyi
..............
page:28-32
Practice of Management Mode for Transmission and Distribution Project Construction Funded in Advance by Government
LIN Zhihuang;CHEN Xiang
..............
page:26-27,35
Application of the Cost Analysis System in Power Engineering Project Construction
GU Zongying
..............
page:23-25
Planning and Designing of Zhengzhou Power Dispatching Data Network
LIU Boyu;LI Linwei
..............
page:20-22,62
A Preliminary Study on the Distributed Generation and Its Influence on Shanghai Power Network
QIU Yuchen;ZHANG Yong;CUI Beibei
..............
page:16-19
The Design Philosophy of 220 kV Power Cable Laying in Shanghai Changjiang Bridge & Tunnel Project
MENG Yu;ZHU Aijun;LU Xin
..............
page:12-15
"Smart Distribution Grid" Lecture(1)
XU Bingyin;LI Tianyou;XUE Yongduan
..............
page:81-84
The Measures to Solve the Existed Problems in Apportioned Electricity Charge Collection
WENG Chaomin
..............
page:80
Application of Oscillating Wave Testing System in the Cable Partial Discharge Detection
FENG Yi;LIU Peng;TU Mingtao
..............
page:57-59
Retrospection of "Technical Rules for Design of Urban Power Cable Lines" Published Thereafter
SHI Chuanqing;ZHU Aijun;GONG Zun
..............
page:52-56
Analysis on the Fault of Fuse Mounted Outside the Capacitor and Countermeasure
XU Peifeng;LI Jian;ZHAO Weihua;WANG Xiaohui
..............
page:50-51
Selection of Reactance Value of Low Voltage Side Current Limiting Reactor in Substation
ZHOU Jinghua
..............
page:48-49
Discussion on the Standardization of Electrical Insulation Tool Test
ZHANG Yongyue;CHEN Jinfa
..............
page:45-47
Discussion on the Connection of Shunt Reactor in the Substation Supplied with Long Power Cables
SUN Liming;XU Tao;YUAN Jingwei
..............
page:42-44
On-site Commissioning Test of Substation Automation System and Improving Measures
ZHANG Yinhua
..............
page:39-41
Ascertaining the Malfunction of Open-phase Protection for Circuit Breakers and Countermeasure
YANG Feng
..............
page:36-38,44