Port Engineering Technology
1004-9592
2016 Issue z1
Consolidation and Renovation of Berth Structures in Tianjin Port
Wang Xuan;,Ren Wei;
..............
page:1-5
Research on Seismic Response of Subsea Pipeline Based on Artificial Viscoelastic Boundary
Yang Haijian;,Zhang Wei;
..............
page:6-9
Comparison and Analysis on Algorithms Used in Risk Assessment for Piled-Berth Superstructures
Zhang Hao;,Sun Keli;
..............
page:10-13
Detection and Analysis of Slope Stability of High-Piled Wharf
Chen Yi;
..............
page:14-17
The Analysis of the Key Technology of Water Intake Construction of Tianjin LNG Receiving Terminal
Li Yunlong;,Han Liang;,Li Zhifeng;
..............
page:18-21
Positioning of Cope Line for Runhua Berth in Gaoshaling Harbor of Tianjin Port
Han Liang;,Li Yunlong;,Zhao Juan;
..............
page:22-25
Selection of Berth Structures for Large Automated Container Terminals in Port of Tianjin
Wang Lijun;,Yuan Fang;,Zhang Zhishang;,Wang Yuhong;
..............
page:26-28,60
Inspection and Detection of a Piled Berth Structure in Tianjin Port
Li Longhua;
..............
page:29-31
Upgrading of South Berth 2 of Petroleum and Chemical Product Terminal at Tianjin Port
Hao Peng;
..............
page:32-34
Grouted Implantation of Anchor Bolts Used in Upgrading of South Berth 3 at Tianjin Port
Xiao Guang;
..............
page:35-36,87
Strengthening and Updating Berths 5 & 6 at Tianjin Port
Liu Yongquan;,Wang Zhili;,Li Yunlong;
..............
page:37-40
Renovation of Berths 19 & 20 at Beijiang Harbor of Tianjin Port
Ren Wei;
..............
page:41-43
Key Techniques Used in Updating Berth 21 in Beijiang Harbor of Tianjin Port
Li Yunlong;,Zhang Zhishan;
..............
page:44-47
Techniques Used in Updating Berth 21 at Tianjin Port
Zhai Fuquan;,Liu Pai;,Fang Qin;
..............
page:48-49
The Renovation of Front Piled Decks of Berths 22 to 24 at Beijiang Habor of Tianjin Port
Lian Lihu;
..............
page:50-52
Key Techniques Used in Upgrading Berths 30 to 33 in Beijiang Harbor of Tianjin Port
Zhang Zhishan;,Wang Lijun;
..............
page:53-57
Updating the Cathode Protection System on Steel Tubular Piles of the Ro-Ro Berth at North Basin of Tianjin Port
Yu Jiang;,Tang Cong;
..............
page:58-60
Study on the Use of Inverseπ Type Breakwater in the Region of Tianjin Port
Sun Jianjun;,Wang Honggang;,Zhu Ziping;
..............
page:61-64
The Application of L-Profiled Deck in Updating of Old Berth Structures
Wang Lijun;,Han Zhichen;,Zhu Ziping;
..............
page:65-67
Steel Case Box Applied in Updating of Piled Berths
Tong Yin;,Zhang Qiang;
..............
page:68-72
Gantry Crane Rail Fracture Test Report of Wharf
Zhao Tiewei;
..............
page:73-76
Fuzzy Comprehensive Evaluation Method Used in Management of Berth Updating Works
Wang Zhili;,Liu Yongquan;
..............
page:77-80
The Difficulties and Key Techniques in Upgrading Old Berth Structures in Tianjin Port
Zhang Zhishan;,Sun Jianjun;,Zhu Ziping;
..............
page:81-84
A Preliminary Analysis of Load Control Standard for Renovated Old Berths
Guan Xuepeng;
..............
page:85-87
Study on Integrated Management System of Improvement and Berthing Capacity of Old Berths of Tianjin Port
Zhang Jianguo;
..............
page:88-89
Macro Management and Process Control for Old Berth Renovation Project in Tianjin Port
Lu Xiaodong;,Man Ruicheng;
..............
page:90-92