Guangdong Power Transmission Technology
1672-6324
2004 Issue 5
Discussing the 2004 HV DC Fault Safety-stabilization Control Policies of CSG
huang he ; wu xiao chen ; hou jun ; yang jin bai ; zeng yong gang ; su yin sheng
..............
page:1-7
Research on HV DC Operation and Control Characteristics of AC/DC Hybrid Grid
mao xiao ming ; peng xian gang ; wu xiao chen
..............
page:8-11
Talking about the Infromationization Construction of the Power Supply enterprise
ma yan lin ; deng yong hong ; chen jian rong
..............
page:11-14
Application of 500kV H-GIS
chen rui bi ; zhang jin song
..............
page:15-17
Development Actuality & Trend of Power Transformer Relay-protection Theory & Technique
wang xue min ; cui hai xia
..............
page:18-21
Discussion about the Commission Test of 110kV XLPE Cable
xiao xiang yang
..............
page:21-24
Reason-analyzing on the Coupling Type Steel Pole Used for Cornering has Inclined to Interior Angle after Straining the Line and Its Solution
zheng xiang long
..............
page:25-26
Analysis on Ventilation/Dispel-heat of the Main Transformer in Indoor Substation and Its Countermeasures
mo wen xiong ; zeng wen zuo
..............
page:27-31
Discussing on the Position-Altering Signal Feedback Time of Remove Control Operating Switch in the Substation Integration Automatization System
wang su jie
..............
page:32-33
Talking Briefly about the Pollution/Overflashing of the Power Transmission Line
wu mei lan
..............
page:34-35
The Problems Occured in Bus-Differential Protection and how to Deal with It
hong yao peng
..............
page:36-37
Discussion on the Management of 110kV and above HV Power Cable Engineering
wu yong jie ; li cui ping
..............
page:38-40
Research and Practice of Copper-made Grounding Device Technique in GIS Substation Project
huang jian guang ; bai zhong lin ; dai zuo xia
..............
page:41-46
Study on Applying the Resisted-heat Conductor to Shenzhen Power Transmission Lines for Expanding the Capacity
wang yi jun
..............
page:46-50
Performance & Evaluation of Purchasing the Engineering Equipment/Material
liao yong mao
..............
page:50-52
How to Manage Interior Bid Invitation and Bidding of the Engineering Projects in the Construction-enterprises
zou guo liang
..............
page:53-55
Optimization and Management of Wattless Power in Distribution Network
chen hai han
..............
page:55-57
Discuss How to Select the Communication Manner of the Load Control System
cai qing wei
..............
page:58-60
The Quality Control to Press-joint Constructing of Over-head Conduct and Grounding Line
chen wei wen ; yan zhi ming
..............
page:61-63
Discussion on the Foundation Treatment of GIS Equipment
zhu hai hua
..............
page:64-66
Imagining on the Construction Model for Power Distribution Automatization of Villages & Towns
xiong wu quan
..............
page:66-68
Building a Spare Control Center in District Power System
zhang ji zhong ; zuo yi yun
..............
page:69-73
Analyze Power Supply/Demand Situation of Meizhou City and Discuss the Countermeasures
luo ji
..............
page:73-76
Discuss on the Connection Form of 110kV Power Network in Jieyang Area
xing lin hua
..............
page:76-78
Aanlysis and forecast to the electric power market of whole state
..............
page:63-63
Italy government invests for improving the power distribution system
..............
page:78-78