Guangdong Power Transmission Technology
1672-6324
2003 Issue 4
Four Academicians Analyze "the Massive Power Failure that Struck America/Canada in Aug.14.2003."
..............
page:4-5
The Chinese Society of Electrical Engineering Invites the Authoritative Experts to Discuss "the Massive Power Failure that Struck America/Canada in Aug.14.2003."
..............
page:1-4
Note
..............
page:插页-插页
The Optimum Design Software Used for Digging Type Tower Foundation with Retaining Beam
jin xiao hua ; huang bing quan ; liang pei quan ; zhu zuo ming
..............
page:5-10
Optic-Electric Transformer (一)--The basic equipment for measuring V, I of power system in the 21th
ye miao yuan ; xiao xia
..............
page:11-16
Discussion on the Technical Features of a Control System of the Conventional Island in Ling Ao Nuclear Power Station
wu guang jian ; zhuo wen biao
..............
page:17-22
The Foundation Design for Tower of 500kV Transmission Line in Soft Soil
liang pei quan
..............
page:23-25
Design and Development of the Software for Calculating Network Theoretical Line Loss
lin hui ; liu ming bo ; cheng qi cheng ; pei ai hua
..............
page:26-31
A Discussion about the Problems of Preventing Operating Mistakes
qi jun ; cao an zuo
..............
page:32-34
Installation and Operation Experience of GIS
chen zuo
..............
page:35-37
Study on the Architecture Development Mode of the Dispatch Automation System in Jieyang Power Network
li nuan qun ; chen zhuang zuo
..............
page:59-61
Discussion on the 15th MV/LV Distribution Network Plan of Dianbei County
luo jing jiang
..............
page:62-66
Information Collect and Edit
..............
page:67-68
The Largest Solar Energy Station Should be Built in Shenzhen
..............
page:23-23
The prelude of 750kv transmission/substation engineering construction has been drawn back in the Northwest.
..............
page:25-25
Look on nuclear power as backbone energy source in Japan.
..............
page:31-31
First batch of power projects named "Xi Dian Dong Song" have been gone to operation one after another.
..............
page:34-34
The temperature difference of nature is also energy source.
..............
page:54-54
Distinguish the Connection of Tramsformer Differential Protection CT
zeng wei guang
..............
page:37-40
Application of Tour-inspecting Management System in Power Supply Management
ye ping
..............
page:41-43
The Reason Causing Fire in Transformer and Prevention Measures
wang hai
..............
page:43-44
Introduce the Tender Method of Electrical Projects by Network
chen zuo shang
..............
page:45-48
A New Generation of Open-Type AMR System Flat
cai qing wei
..............
page:49-52
Analysis on the Way Connecting Local Stations into the Power System
luo hai bin
..............
page:52-54
Discuss the Application of Split-phase Current-differential Protection in EHV Transmission Lines
li zhe
..............
page:55-59