Home | Survey | Payment| Talks & Presentations | Job Opportunities
Journals   A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
Dam Observation and Geotechnical Tests
1000-1352
2007 Issue 4
Intelligentized Reform of DC Power Supply System of Siyang Second Pumping Station
wang yan; zhang qianjin; liu jian(siyang sluice administration office; siyang 223700; china)
..............page:80-81
Realization of Yellow River Xiaolangdi Central Control System in Zhengzhou
yuan hong1; yang yeping1; dong zeliang2; yu jing1(1.china institute of water resources and hydropower research; beijing 100038; china)(2.xiaolangdi multipurpose project construction and management bureau; zhengzhou 450000; china)
..............page:26-29
Substitution of Intelligent Total Station Trigonometric Leveling for Second-order Leveling
yan hongbo; huang teng; deng biao(hohai university; nanjing 210098; china)
..............page:43-47
Renovation Characteristics of the Computer Monitoring and Control System of Changhu Hydropower Plant
chen xiangrong1; li haiwen1; zhang jingjing2(1.guangdong yuedian changhu power generation co ltd; yingde 513021; china)(2.nanjing automation research institute; nanjing 210003; china)
..............page:23-25
Selection of De-excitation Resistors for Hydraulic Generators
chen xianming; wang wei; liu guohua(nanjing automation research institute; nanjing 210003; china)
..............page:12-16
Application of GM(1,1) Model to Subsidence Prediction for Hongshanyao Pumping Station
xu chang1; yue dongjie1; yan weibiao2(1.hohai university; nanjing 210098; china; 2.nanjing university of technology; nanjing 210009; china)
..............page:54-56,63
Statistical Diagnosis for the Monitoring Data of Dam Slipmass
guo li; yuan yongsheng; li ziyang(hohai university; nanjing 210098; china)
..............page:51-53
Seepage Monitoring Data Analysis for Qiafuqihai Clay Core Dam
zhang afeng; wang jianguo(xinjiang yili river development and construction administration bureau; urumchi 830000; china)
..............page:57-60
Design of GPRS-based Supervisory and Control System for Sluices
zhu meiqiang1; meng xianqing1; liu chuanping2; li ming1(1.china university of mining & technology; xuzhou 221008; china)(2.xuzhou science computer engineering research institute; xuzhou 221151; china)
..............page:69-73
Reservoir Scheduling-based Second Dispatching of Water for Small Hydropower Stations
ma yuexian; wang yanhua; yang tianping; chen xiaoguang(zhengzhou university; zhengzhou 450002; china)
..............page:61-63
Hierarchy Control-based Automatic Control Software Design for Sluice Groups
shi xiaojun1; yi chunhui1; 2; huang jianping1 (1.xi an aerospace automation co ltd; xi an 710065; china) (2.xi an jiaotong university; xi an 710049; china)
..............page:67-68,73
Comparison of the Main Protection Designs for Hydro-generators with Multi-branch Per Phase of Longyangxia and Laxiwa Hydropower Stations
gui lin1; wang weijian1; xi yu2; zhang qungang2(1.tsinghua university; beijing 100084; china)(2.northwest investigation design and research institute; xi an 710065; china)
..............page:38-42
Development and Application of the Analysis Software for Safety Monitoring of Daheiting Dam
zhou shihu(daheiting project management bureau; qianxi 064300; china)
..............page:48-50,63
Performance Analysis for Hydroturbine Governing System
tan qunfeng; li zhaohui (huazhong university of science and technology; wuhan 430074; china)
..............page:34-37
Some Problems in Design and Type Selection of Hydro-turbine Governors
guo yuhu(qinghai yellow river generate electricity transporta co ltd; xining 810003; china)
..............page:20-22
SCADA System Structure of Three Gorges Right Bank Hydropower Station and the Functions of LCUs
yang chunxia1; li jianhui1; zhang jie1; wu gang2(1.beijing iwhr technology co ltd; beijing 100038; china)(2.changjiang institute of survey; planning; design and research; wuhan 430010; china)
..............page:1-6
Structure and Characteristics of the Computer Monitoring and Control System of Longtan Hydropower Station
kong dening1; duan zhongping1; li zhenjiang1; wen liu2(1.longtan hydropower plant; tian e 547300; china; 2.nanjing automation research institute; nanjing 210003; china)
..............page:7-11,25
Discussion on Algorithm of the United Scheduler for Xiaolangdi and Xixiayuan Hydropower Plants
zhang guanjie; yu yongjun; sun liying; zhao zitao(xiaolangdi hydropower plant; jiyuan 454681; china)
..............page:64-66
Supervision and Control System for the Floodgates of Yantan Hydropower Plant
yuan lili; bai jianfei(china institute of water resource and hydropower research; beijing 100038; china)
..............page:74-76
Design of Computer Monitoring and Control System of Xietai Pumping Station
gong yudong1; liu xinquan2; yao huaizhu1; hu yanming3; miao yongjun3(1.liushan p.& xietai p.management division of south-to-north water diversion of jiangsu province; xuzhou 221100; china)(2.jiangsu surveying and design institute of water resources co ltd; yangzhou 225009; china)(3.nanjing automation research institute; nanjing 210003; china)
..............page:77-79
xiao shan dian zhan 1 hao ji dao ye tao tong lou shui chu li
wang huan dong
..............page:82-84
A Primary Frequency Regulation Test for Unit 3 of Daxia Hydropower Station
zhang dongcheng; guan xiaogang; li yuhong(gansu xiaosanxia hydropower development co ltd; lanzhou 730050; china)
..............page:17-19,22
Function and Structure Design for Hydropower Enterprise ERP System
zhang gaoqun(chongqing university; chongqing 400044; china)
..............page:30-33,47
xin xi dong tai
..............page:42,47,60,66,84